Laserfiche WebLink
D EQ0 <br /> . ..'-;' ,E,::,.. V IlE,rx; <br /> LIGHTING COMPLIANCE SUMMARY 05 I 7 Tiliz _1....) <br /> 2018 WSEC Compliance Forms for Commercial Buildings including Group R2,R3&R4 over 3 stories and all RI [] T Administered by:©2023 NEEA,All rights reserved <br /> Project Title Mountain Pacific Bank-2018 WSEC For el1dn erne 4E.RE 1 I Date: Feb 13,2023 <br /> 3726 Broadway Avenue Permit Services <br /> Project Address 108 <br /> Project&Applicant Everett,WA 98201 <br /> Information Applicant Name Miles Walker <br /> Applicant Phone 425-259-0868 <br /> Applicant Email miles@bnharch.com <br /> For questions about this report,contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport@waenergycodes.com <br /> General Occupancy All Commercial General Building Use Type Office,Bank/Financial_Building Cond.Floor Area 38,777 <br /> New Building or Project Cond.Floor Area 2,163 <br /> Alteration <br /> • General Project Types Tenant Spaces—First Build Out Addition Interior Lighting Lighting Scope Floors Above Grade 2 <br /> Lighting Scope Compliance Method Compliance Method I-General <br /> Lighting Project Description New tenant improvement with non-bearing partitions,acoustical ceiling and lighting. <br /> Interior/Exterior LPA Calculation <br /> Lighting Compliance Scope Project Type (Interior includes both interior&parking) Luminaire Replacement Scope Compliance Method Adjustment Compliance Verification <br /> and Method Tenant Spaces—First Build Out Interior Lighting Building area No Calculation Adjustments selected COMPLIES <br /> Additional Efficiency <br /> Options Included <br /> Project Title Mountain Pacific Bank-2018 WSEC Date Feb 13,2023 <br /> Lighting Power Calculation TENANT SPACES—FIRST BUILD OUT-INTERIOR LIGHTING Compliance Verification COMPLIES <br /> Compliance Method Building area LPA Calculation Adjustment none <br /> Interior Lighting Power Allowance-Building Area <br /> Building Areas Gross Interior Area(SF) LPA(Watts/SF) Total Watts Allowed Total Proposed Watts Compliance Status by <br /> (SF x LPA x 1) By Building Area Building Area <br /> Office 2,163 0.64 1,384 748 COMPLIES <br /> • Proposed Lighting Power Density per <br /> Total Watts <br /> Watts <br /> New or Quantity of Fixtures,CLDs orTotal Linear Watts per Linear Proposed <br /> Fixture Type/Application Fixture ID Building Area Fixture,CLD or <br /> Existing-to-Remain Luminaires(#F) Feet(LF) Foot(WpLF) (#F x WpF)or <br /> Luminaire(WpF) (LF x WpLF) <br /> Individual Fixtures <br /> Troffer F1 Office New 44 17 748 <br /> Project Title Mountain Pacific Bank-2018 WSEC Date Feb 13,2023 <br /> Proposed Fixtures Details TENANT SPACES—FIRST BUILD OUT-INTERIOR LIGHTING <br /> Fixture Type/Application Fixture ID Location in Documents Lamp Type Building Area New or <br /> Existing-to-Remain <br /> Individual Fixtures _ <br /> Troffer Fl A2.0 LED Office New <br /> Fixture Description: Are these fixtures located within a daylight zone?: <br /> Do these fixtures require specific application lighting controls?: <br />