My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3726 BROADWAY MOUNTAIN PACIFIC BANK 2025-04-11
>
Address Records
>
BROADWAY
>
3726
>
MOUNTAIN PACIFIC BANK
>
3726 BROADWAY MOUNTAIN PACIFIC BANK 2025-04-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2025 1:47:53 PM
Creation date
4/9/2025 9:16:35 AM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
3726
Tenant Name
MOUNTAIN PACIFIC BANK
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D EQ0 <br /> . ..'-;' ,E,::,.. V IlE,rx; <br /> LIGHTING COMPLIANCE SUMMARY 05 I 7 Tiliz _1....) <br /> 2018 WSEC Compliance Forms for Commercial Buildings including Group R2,R3&R4 over 3 stories and all RI [] T Administered by:©2023 NEEA,All rights reserved <br /> Project Title Mountain Pacific Bank-2018 WSEC For el1dn erne 4E.RE 1 I Date: Feb 13,2023 <br /> 3726 Broadway Avenue Permit Services <br /> Project Address 108 <br /> Project&Applicant Everett,WA 98201 <br /> Information Applicant Name Miles Walker <br /> Applicant Phone 425-259-0868 <br /> Applicant Email miles@bnharch.com <br /> For questions about this report,contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport@waenergycodes.com <br /> General Occupancy All Commercial General Building Use Type Office,Bank/Financial_Building Cond.Floor Area 38,777 <br /> New Building or Project Cond.Floor Area 2,163 <br /> Alteration <br /> • General Project Types Tenant Spaces—First Build Out Addition Interior Lighting Lighting Scope Floors Above Grade 2 <br /> Lighting Scope Compliance Method Compliance Method I-General <br /> Lighting Project Description New tenant improvement with non-bearing partitions,acoustical ceiling and lighting. <br /> Interior/Exterior LPA Calculation <br /> Lighting Compliance Scope Project Type (Interior includes both interior&parking) Luminaire Replacement Scope Compliance Method Adjustment Compliance Verification <br /> and Method Tenant Spaces—First Build Out Interior Lighting Building area No Calculation Adjustments selected COMPLIES <br /> Additional Efficiency <br /> Options Included <br /> Project Title Mountain Pacific Bank-2018 WSEC Date Feb 13,2023 <br /> Lighting Power Calculation TENANT SPACES—FIRST BUILD OUT-INTERIOR LIGHTING Compliance Verification COMPLIES <br /> Compliance Method Building area LPA Calculation Adjustment none <br /> Interior Lighting Power Allowance-Building Area <br /> Building Areas Gross Interior Area(SF) LPA(Watts/SF) Total Watts Allowed Total Proposed Watts Compliance Status by <br /> (SF x LPA x 1) By Building Area Building Area <br /> Office 2,163 0.64 1,384 748 COMPLIES <br /> • Proposed Lighting Power Density per <br /> Total Watts <br /> Watts <br /> New or Quantity of Fixtures,CLDs orTotal Linear Watts per Linear Proposed <br /> Fixture Type/Application Fixture ID Building Area Fixture,CLD or <br /> Existing-to-Remain Luminaires(#F) Feet(LF) Foot(WpLF) (#F x WpF)or <br /> Luminaire(WpF) (LF x WpLF) <br /> Individual Fixtures <br /> Troffer F1 Office New 44 17 748 <br /> Project Title Mountain Pacific Bank-2018 WSEC Date Feb 13,2023 <br /> Proposed Fixtures Details TENANT SPACES—FIRST BUILD OUT-INTERIOR LIGHTING <br /> Fixture Type/Application Fixture ID Location in Documents Lamp Type Building Area New or <br /> Existing-to-Remain <br /> Individual Fixtures _ <br /> Troffer Fl A2.0 LED Office New <br /> Fixture Description: Are these fixtures located within a daylight zone?: <br /> Do these fixtures require specific application lighting controls?: <br />
The URL can be used to link to this page
Your browser does not support the video tag.