Laserfiche WebLink
M <br /> N � <br /> DUCT LINE EQUIVALENTS SYMBOLS GENERAL PIPING ABBREVIATIONS GENERAL NOTES <br /> 0 <br /> SINGLE LINE DOUBLE LINE DESCRIPTION SYMBOL ABBR DESCRIPTION SYMBOL ABBR DESCRIPTION AC AIR CONDITIONING UNIT <br /> AFF ABOVE FINISHED FLOOR 1. THE MECHANICAL SCOPE OF WORK SHALL INCLUDE WORK INDICATED ON DRAWINGS. <br /> �• �J' 90' ELBOW UP(SUPPLY) ® / 45' ELBOW AND AIR HANDLING UNIT <br /> Z_ �J' 90' ELBOW UP(RETURN/EXHAUST) <br /> � AD ACCESS DOOR IN CEILING 45' DOWN AMS AIRFLOW MEASURING UNIT 2. VERIFY EXISTING CONDITIONS BEFORE COMMENCING WORK ON AN EXISTING <br /> AD ACCESS DOOR IN WALL B BOILER MECHANICAL SYSTEM. <br /> Z— 90' ELBOW DOWN (SUPPLY) 90' ELBOW BOO BTTOM FT DAMPER <br /> oP xx xx° � UP HOD BOOTTOM OF DUCT 3 VERIFY LOCATIONS AND DIMENSIONS OF EQUIPMENT AND COORDINATE WORK PRIOR TO <br /> BOP BOTTOM OF PIPE ELEVATION BOT BOTTOM START OF CONSTRUCTION. <br /> �-t 90' ELBOW DOWN(RETURN/EXHAUST) C DN DOWN BTUH BRITISH THERMAL UNIT PER HOUR <br /> �( CENTERLINE 4. COORDINATE MECHANICAL WORK WITH OTHER TRADES TO INSURE PROPER AND <br /> �-z fL-I_ RADIUS ELBOW UP(SUPPLY) - ALIGNMENT GUIDE CC COOLING COIL ADEQUATE INTERFACE OF THEIR WORK WITH THE WORK OF THIS CONTRACTOR. INSTALL <br /> RADIUS ELBOW UP(RETURN/EXHAUST) �� ANCHOR CHLR CHILLER <br /> Q xx'-xx" CL-EL CENTERLINE OF PIPE ELEVATION CFM CUBIC FEET PER MINUTE MECHANICAL WORK AS HIGH AS POSSIBLE,TIGHT TO STRUCTURE ABOVE. <br /> • <br /> CLG CEILING <br /> RADIUS ELBOW DOWN(SUPPLY) DETAIL OR ENLARGED PLAN, NUMBER FOR IT, CNTFGL CENTR FUGAL 5. ELEVATIONS ARE REFERENCED FROM FINISHED FLOOR, UNLESS NOTED OTHERWISE. G <br /> X-X DETAIL,LETTER FOR ENLARGED PLAN TAG AUTOMATIC CONTOL VALVE(3-WAY) COND CONDENSER/CONDENSATE <br /> �-t RADIUS ELBOW DOWN(RETURN/EXHAUST) CP CIRCULATING PUMP 6. THE MECHANICAL DRAWINGS ARE SCHEMATIC IN NATURE AND DO NOT ATTEMPT TO o <br /> CT COOLING TOWER SHOW ALL REQUIRED OFFSETS. REFER TO ARCHITECTURAL FOR CONSTRUCTION <br /> e ROUND DUCT UP(S/R/E) AUTOMATIC CONTROL VALVE(2-WAY) CU CONDENSING UNIT/CUBIC DETAILS. <br /> y CV CONSTANT VOLUME <br /> c— ROUND DUCT DOWN (S/R/E BALANCING VALVE CWP CHILLED WATER PUMP 7. MECHANICAL EQUIPMENT SHALL NOT BE USED FOR TEMPORARY HEAT DURING <br /> DETAIL/SECTION CALL-OUT D DRAIN CONSTRUCTION. <br /> TURNING VANE ELBOW BV BALL VALVE DB DRY BULB/DECIBEL DEG DEGREE 8. DUCTWORK SIZES SHOWN ARE INSIDE CLEAR. ADD APPROPRIATE DIMENSION FOR z <br /> Sq <br /> BFV BUTTERFLY VALVE DIA DIAMETER INSULATION OR DUCT LINER TO OBTAIN 'TOTAL"DUCT SIZE. g <br /> RADIUS ELBOW, RECT EF-x EQUIPMENT MARK TYPE- (EG"EF", FOR EXHAUST DMPR DAMPER of <br /> < <br /> FAN)THEN UNIQUE IDENTIFIER X' �� CHK CHECK VALVE DN DOWN 9. PROVIDE TRANSITIONS REQUIRED TO CONNECT DUCTWORK TO AIR TERMINAL UNITS, a <br /> FANS,AND OTHER MECHH ANICAL EQUIPMENT. <br /> EA EXHAUST AIR z <br /> 0 DIFFUSER/GRILLE DESIGNATION -TYPE"-"TO �6=1GAS COCK EAT ENTERING AIR TEMPERATURE O <br /> XXN � EDIT ECONOMIZER 10. COORDINATE EXACT LOCATIONS OF ROOM THERMOSTATS AND/OR ROOM TEMPERATURE H <br /> RADIUS ELBOW, ROUND MATCH SCHEDULE THEN "XXX"FOR CFM EDIT ELECTRIC DUCT HEATER SENSORS WITH ARCHITECT PRIOR TO INSTALLATION. MOUNT WALL THERMOSTATS AT 48" F_ <br /> GLOBE VALVE AFF PER MOST RECENT VERSION OF ADA. <br /> EER ENERGY EFFICIENCY RATIO FLOW ARROW GV GATE VALVE EF EXHAUST FAN H <br /> ELEC ELECTRIC 11. PROVIDE A VOLUME DAMPER FOR EACH SUPPLY, RETURN,AND EXHAUST OPENING z <br /> ,> 0 TRANSITION (ROUND TO ROUND/ IE XX'-XX" IE INVERT PIPE ELEVATION �� ELEV ELEVATION AND IN BRANCHES WHERE THREE OR MORE OPENINGS ARE ASSOCIATED WITH THE 0 <br /> RECTANGULAR TO RECTANGULAR) PRV PRESSURE REDUCING VALVE ESP EXTERNAL STATIC PRESSURE BRANCH AND ELSEWHERE AS NOTED ON THE DRAWINGS. u <br /> EWT ENTERING WATER TEMPERATURE <br /> <'+-2 TRANSITION (RECTANGULAR TO ROUND) PITCH LEFT RV RELIEF VALVE EXH EXHAUST <br /> 12. PROVIDE N THICK DUCT LINER IN RECTANGULAR SUPPLY AIR OTHERWISE. <br /> WITHIN FIVE <br /> EXT EXTERIOR/EXTERNAL FEET DOWNSTREAM OF AIR TERMINAL UNITS UNLESS NOTED OTHERWISE. ° aaaaaaa RECT SPIN-IN TAKEOFFLE" _ z <br /> ROUND ) PITCH RIGHT SV SOLENOID VALVE FCU FAN COIL UNIT <br /> FD FIRE DAMPER/FLOOR DRAIN 13. PROVIDE 1"THICK DUCT LINER IN RECTANGULAR RETURN DUCTWORK WITH IN FIVE FEET OF <br /> 0 DRAWING NOTE DESIGNATION ��� NEEDLE ISOLATION VALVE FLTR FILTER AIR TERMINAL UNITS, PROVIDE 1"THICK DUCT LINER IN RECTANGULAR TRANSFER DUCTWORK, <br /> ` ROUND CONICAL TEE FPM FEET PER MINUTE UNLESS NOTED OTHERWISE. <br /> AUTOMATIC INTERLOCKED <br /> ROUND ► T TOP OF DUCT,BOTTOM OF DUCT ~_� FSD FIRE SMOKE DAMPER <br /> _ 2-WAY BUTTERFLY VALVE FT FEET 14. GENERAL CONTRACTOR SHALL PROVIDE CUTTING, FRAMING, PATCHING,SEALING AND PAINTING OF <br /> B T PTO FAN TERMINAL UNIT WALLS,CEILING AND FLOOR OPENINGS.THIS INCLUDES OPENINGS THROUGH AREA SEPARATION <br /> TEE WITH TURNING VANES ? BREAK TV FACE VELOCITY <br /> OP xx'-xx" WALLS. <br /> CAP GALV GALVANIZED TOP TOP OF PIPE ELEVATION <br /> C <br /> GPM GALLONS PER MINUTE <br /> BRANCH TAKEOFF,RECT F PLUG GWB GYPSUM WALLBOARD <br /> POC POINT OF CONNECTION HC HEATING COIL <br /> HORIZ HORIZONTAL <br /> PG PRESSURE GAUGE <br /> HP HORSEPOWER HT HEAT TRACE VICINITY MAP <br /> BRANCH TAKEOFF,ROUND HVAC HEATING VENTILATING AND AIR CONDITIONING <br /> ROUND—► ROLLING 45 DOWN HX HEAT EXCHANGER <br /> REDUCER ID NDIRECT DRAIN/INSIDE DIAMETER LEGAL DESCRIPTION <br /> INCH NCH SEC 03 TWP 28 RGE 04LOT 1 OF SEAWAY CENTER TWO/INTERMIC BSP RED VOL 1 <br /> RECT BRANCH TEE, RECT 4 REDUCING CONCENTRIC KW KILOWATT PGS 181 THRU 183 AF 8910255009& BEING PTN SE1/4 <br /> REDUCING ECCENTRIC <br /> LAT LEAVING AIR TEMPERATURE PARCEL NUMBER <br /> RECT CONICAL SPIN-IN TAKEOFF 0 DRAWING NOTE DESIGNATION LWT LEAVLB ING WATER TEMPERATURE 28040300400300 <br /> ROUND >• SLEEVE MBH THOUSAND BTU PER HOUR <br /> M <br /> CONTROLS MECHANICAL <br /> �� TEE DOWN MOD <br /> MOTOR OPERATED DAMPER <br /> ROUND BOOT TEE � MTD MOUNTED W <br /> TEE NC NORMALLY CLOSED/NOISE CRITERIA (} <br /> ROUND >• PI PI PRESSURE INDICATOR NIC NOT IN CONTRACT <br /> �--t TI TEMPERATURE INDICATOR TH THERMOMETER NO NORMALLY OPEN/NUMBER X - d Z <br /> ` \ 47� 45' LATERAL TI NTS NOT TO SCALE - Oct <br /> ? OS TS TEMPERATURE SENSOR OBD OPPOSED BLADE DAMPER l <br /> 45'CONICAL LATERAL �a T WALL MOUNTED TSTAT WITH CONTROL LINE U UNION OC ON CENTER I ' l l l l ' V <br /> OD OUTSIDE DIMENSION OR DIAMETER <br /> • VERTICAL SLEEVE OSA OUTS DE AIR W <br /> PD PRESSURE DROP/PUMPED DRAIN <br /> R ELEVATION CHANGE + VALVE IN PIPE RISE OR DROP PL PLENUM n�® <br /> F p a) <br /> R R RISE(R)OR DROP(D) POC POINT OF CONNECTION PT POST-TENSION SLAB 0 <br /> ~ STIR WYE TYPE STRAINER '� o a >c4 <br /> i--i AIR FLOW DIRECTION -SUPPLY RA RETURN AIR - - we®� W m Obi <br /> WYE TYPE STRAINER WITH VALVE AND REF REFERENCE B <br /> AIR FLOW DIRECTION - <Ixl HOSE END REV REVISION <br /> RF RELIEF FAN <br /> RETURN OR EXHAUST AAV AUTOMATIC AIR VENT HIT RELATIVE HUMIDITY <br /> RV REFRIGERANT VENT <br /> dI DUCT END CAP <br /> BEN BFW BOILER FEED WATER SA SUPPLY AIR s Z l W W <br /> 2H-FFF++H-H2 FLEXIBLE DUCTWORK BUCKET STEAM TRAP SENS SENSIBLE Y a Wct <br /> SF SUPPLY FAN SQUARE FOOT O W <br /> 1 MANUAL VOLUME DAMPER -CA- CA CONTROL AIR SL SOUND LINE(INSIDE DUCT INSU ATION) ao Q, <br /> SMACNA SHEET METAL AND AIR CONDITIONING CONTRACTORS NATIONAL ASSOCIATION o C o Cm9 W 3 <br /> R CHR CHR CHILLED WATER RETURN SP STATIC PRESSURE a` i a o <br /> R SS STAINLESS STEEL <br /> 1 REMOTE VOLUME DAMPER -CHS- CHS CHILLED WATER SUPPLY ST SOUND TRAP <br /> F? 2 F -CR- CR CONDENSER WATER RETURN TCV TEMPERATURE CONTROL VALVE SEAWAY BLVD <br /> FIRE/SMOKE DAMPER - PROVIDE ACCESS -CS- CS CONDENSER WATER SUPPLY TOD TOTAL <br /> OFDYDUCTC HEAD N N 0 =r=w <br /> FD FD TOS TOP OF STEEL Lu o>- r u Cam <br /> FLANGE TP TOTAL PRESSURE Q O w <br /> FIRE DAMPER - PROVIDE ACCESS TSP TOTAL STATIC PRESSURE PROJECT LOCATION x a u LL z a)>u <br /> FLEX TYP TYPICAL r o- o o O- <br /> ? D MOTOR OPERATED DAMPER ■ FLOAT AND THERMOSTATIC STEAM TRAP UBD UPBLAST DISCHARGE J ¢w U 3 w U <br /> UH UNIT HEATER =w'6¢o rn wrn <br /> BDD 4gpp FOR- FOR FUEL OIL RETURN DINO UNLESS NOTED OTHERWISE Q z r 2 y 0 w z <br /> -FOS- FOS FUEL OIL SUPPLY VAV VARIABLE AIR VOLUME Z <<}-O O r z y a <br /> BACKDRAFT DAMPER r O r <br /> n n NORTH ARROW w <br /> -FOV- FOV FUEL OIL VENT VD VOLUME DAMP R o z m¢ O¢w¢ <br /> HUMIDIFIER G G NATURAL GAS VELVENT VELOCITY VENTILATION VENTILATOR U m 53 w z w O u~w z <br /> =W zO(/1Q W¢zo <br /> -HCR- HCR HIGH PRESSURE CONDENSATE RETURN W INSULATED DUCT/WATT/WIDE J r x O O a m 3 o <br /> WB WET BULB(TEMPERATURE) ZQ <br /> ® SUPPLY GRILLE OR DIFFUSER -HG- HG HOT GAS WT WEGHTGADGE MECHANICAL INDEX OF DRAWINGS <br /> -HPS- FPS HIGH PRESSURE STEAM � <br /> E RETURN/EXHAUST GRILLE HWR HWR HEATING WATER RETURN <br /> 0 ROUND DUCT -HWS- HWS HEATING WATER SUPPLY SHEEP DESCRIPTION <br /> -LCR- LCR LOW PRESSURE CONDENSATE RETURN <br /> -LPS- LPS LOW PRESSURE STEAM MO.01 LEGEND,DRAWING INDEX,VICINITY MAP AND GENERAL NOTES ~ <br /> MP2.01 MECHANICAL PIPING PLAN—LEVEL 1 Z <br /> MAv MANUAL AIR VENT M3.01 PIPE ROUTING DIAGRAM V <br /> -MCR- MCR MEDIUM PRESSURE CONDENSATE RETURN M4.01 MECHANICAL PIPING DETAILS > <br /> METER REFER TO PLANS FOR METER SERVICE y� <br /> E E <br /> -MG- MG MEDIUM PRESSURE NATURAL GAS Q 0 <br /> E -MPS- MPS MEDIUM PRESSURE STEAM Z U <br /> -PCR- PCR PUMPED CONDENSATE RETURN PROJECT SCOPE u E <br /> RL RL REFRIGERANT LIQUID Z 7 <br /> -RS- RS REFRIGERANT SUCTION <br /> a -RV- RV REFRIGERANT VENT Q <br /> T ROUTE PIPING TO SERVE NEW EQUIPMENT p� <br /> TEMPERATURE PRESSURE TEST PLUG NEW EQUIPMENT:COOLER,PUMP SKID,TEST CELLS AND EXPANSION TANK p <br /> VB VACUUM BREAKER 0 <br /> VENTURI <br /> Ix <br /> Z <br /> Lu <br /> U <br /> Lu <br /> J <br /> E F <br /> I <br /> i <br /> i <br /> i <br /> Drawn By UMC <br /> Checked By RK <br /> a Original Issue Date 03/03/2023 <br /> 0 <br /> Job No. 8963 <br /> o f Scale AS SHOWN <br /> Sheet No. <br /> o N <br /> <, M0.01 <br />