My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2918 NASSAU ST 2025-08-14
>
Address Records
>
NASSAU ST
>
2918
>
2918 NASSAU ST 2025-08-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2025 10:40:51 AM
Creation date
4/9/2025 11:40:23 AM
Metadata
Fields
Template:
Address Document
Street Name
NASSAU ST
Street Number
2918
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />VERETT <br />Permit Inspections <br />City of Everett <br />10/11/2023 <br />10/11/2023 <br />PLUMB 033--ROUGH <br />I JEFF M RHODE <br />CANCELLED <br />see notes <br />IN <br />Notes: <br />10/10/2023 2:47 PM JBAR PLUMBING LLC <br />101 202 301401 <br />Contact Name: JBAR PLUMBING LLC <br />Site Address: 2918 NASSAU ST <br />Phone:4253434073 <br />e-Mail: javier@jbarplumbing.com <br />-duplicate inspections called in <br />11/20/2023 <br />11/20/2023 <br />PLUMB 08-FINAL** <br />JASON <br />CORRECTION <br />see notes <br />MORRISSEY <br />REQUIRED <br />Notes: <br />11/16/2023 3:52 PM JBAR PLUMBING LLC <br />301and 401 <br />Contact Name: JBAR PLUMBING LLC <br />Site Address: 2918 NASSAU ST <br />Phone:4253434073 <br />e-Mail: javier@jbarplumbing.com <br />- (401) grade 7/8 dishwasher hose by gravity to wye branch. Currently back graded and trapped. 708.1 GeneralHorizontal drainage piping shall be run in <br />practical alignment and a uniform slope of not less than 1/4 inch per foot (20.8 mm/m) or 2 percent toward the point of disposal. Install hammer <br />arrester on supply to dishwasher per the UPC 609.10 Water Hammer. Tighten seismic straps on water heater more securely. Leak under bathroom lay. <br />Replace corrugated tubular tailpiece on lav with smooth wall tailpiece per the UPC. Caulk toilet to floor per UPC 402.2 joints.- (301) Air -gap hooked up <br />backwards. Gravity drain must be 7/8" drain hose graded from air gap to 7/8" tailpiece wye branch. Missing hammer arrester on dishwasher. Missing <br />caulking on toilet. <br />11/21/2023 <br />11/21/2023 <br />PLUMB 08-FINAL** <br />JASON <br />PARTIAL <br />see notes <br />MORRISSEY <br />APPROVAL <br />Notes: <br />11/20/2023 2:26 PM JBAR PLUMBING LLC <br />301and 401 <br />Contact Name: JBAR PLUMBING LLC <br />Site Address: 2918 NASSAU ST <br />Phone:4253434073 <br />e-Mail: javier@jbarplumbing.com <br />- 401 and 301. Final complete. <br />11/22/2023 <br />11/22/2023 <br />PLUMB 08-FINAL** <br />JASON <br />CORRECTION <br />see notes <br />MORRISSEY <br />REQUIRED <br />Notes: <br />11/21/2023 12:09 PM JBAR PLUMBING LLC <br />101 and 201 <br />Contact Name: JBAR PLUMBING LLC <br />Site Address: 2918 NASSAU ST <br />Phone:4253434073 <br />e-Mail: javier@jbarplumbing.com <br />- Fasten dishwashers to cabinet per installation instructions. Unit 101 and 201. <br />�A_ <br />Printed: Thursday, 06 March, 2025 5 of 6 rk <br />SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.