My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2918 NASSAU ST 2025-08-14
>
Address Records
>
NASSAU ST
>
2918
>
2918 NASSAU ST 2025-08-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2025 10:40:51 AM
Creation date
4/9/2025 11:40:23 AM
Metadata
Fields
Template:
Address Document
Street Name
NASSAU ST
Street Number
2918
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />VERETT <br />Permit Inspections <br />City of Everett <br />6/2/2023 <br />6/2/2023 <br />PLUMB 03-ROUGH <br />JASON <br />CORRECTION <br />see notes <br />IN <br />MORRISSEY <br />REQUIRED <br />Notes: <br />5/31/2023 11:14 AM JBAR PLUMBING LLC <br />202 and 102 <br />Contact Name: JBAR PLUMBING LLC <br />Site Address: 2918 NASSAU ST <br />Phone:4253434073 <br />e-Mail: javier@jbarplumbing.com <br />- Finish installing vents for AW in unit 102 and 202. Currently cut off inside wall cavity.- Remove or install solid cap on waste arms for 2" by 11/2" san <br />tees on common AW drain and higher drain in closet next to AW. In unit 102.- Need 2" vent minimum for toilets in 102 and 202. Per the UPC table 703.2 <br />- Relief line discharge has to run separately from pan drain to indirect waste per the UPC 608.5 <br />- Finish installing vents for AW in unit 102 and 202. Currently cut off inside wall cavity.- Remove or install solid cap on waste arms for 2" by 11/2" san <br />tees on common AW drain and higher drain in closet next to AW. In unit 102.- Need 2" vent minimum for toilets in 102 and 202. Per the UPC table 703.2 <br />- Relief line discharge has to run separately from pan drain to indirect waste per the UPC 608.5 <br />6/16/2023 <br />6/16/2023 <br />PLUMB 03-ROUGH <br />JASON <br />CORRECTION <br />see notes <br />IN <br />MORRISSEY <br />REQUIRED <br />Notes: <br />6/14/2023 5:29 PM JBAR PLUMBING LLC <br />102 and 202 <br />Contact Name: JBAR PLUMBING LLC <br />Site Address: 2918 NASSAU ST <br />Phone:4253434073 <br />e-Mail: javier@jbarplumbing.com <br />- Install minimum 2" vent communicating through the roof for toilet s in 102 and 202. Currently venting bottlenecks down to 11/2" galvanized in unit <br />202.*** Per table 703.2 note 3.- Finish installing mechanical vent rough in box for AW in unit 102. <br />6/23/2023 <br />6/23/2023 <br />PLUMB 03-ROUGH <br />JASON <br />CORRECTION <br />see notes <br />IN <br />MORRISSEY <br />REQUIRED <br />Notes: <br />- No access to 202 to confirm corrections for toilet vent. Door locked!-102 still missing vent termination for auto washer. Mechanical Vent box? No <br />Access. Please reschedule online when access is available. To speak with an Inspector to get an ETA or to provide access instructions please call 425-257- <br />8810 option 4 between 730a.m. and 830a.m. the morning of your scheduled inspection. <br />6/23/2023 <br />6/23/2023 <br />PLUMB 08-FINAL <br />JASON <br />NO ACCESS <br />see notes <br />MORRISSEY <br />Notes: <br />6/20/2023 7:00 PM JBAR PLUMBING LLC <br />Final: 302 and 402 <br />Rough -in: 102 and 202 <br />Contact Name: JBAR PLUMBING LLC <br />Site Address: 2918 NASSAU ST <br />Phone:4253434073 <br />e-Mail: javier@jbarplumbing.com <br />CUSTOMER CALLED AND CANCELED APPT <br />- No access to 302 and 402. Doors locked!No Access. Please reschedule online when access is available. To speak with an Inspector to get an ETA or to <br />provide access instructions please call 425-257-8810 option 4 between 730a.m. and 830a.m. the morning of your scheduled inspection. <br />�A_ <br />Printed: Thursday, 06 March, 2025 4 of 7 rk <br />SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.