Laserfiche WebLink
Intake &Approval Sheet (FOR PERMIT STAFF ONLY) PERMIT# <br /> BUILDING I LANNING <br /> Intake OK by: Date: Intake OK by: Assign To: Date: <br /> Intake Comments: Intake Comments: <br /> Zone 2A <br /> Overlay/Agreement <br /> O Route to Commercial Building Nonresidential Use <br /> ❑ Route to Residential Building Residential Use 6P12, <br /> ❑ Make this a"W"Permit Proposed No.of Dwelling Units: <br /> Bldg/TI/Addn/Rem Size Total No.of Dwelling Units: <br /> Garage/Accessory Struct.Size Planning/Landscape Inspection Required before Final? ❑Yes ❑No <br /> Number of Stories "In Lieu"Fee:Type: Amount$ <br /> Basement ❑No ❑Yes, Fin/Unfin School Impact Fee: Total $ /- <br /> Type of Construction L'/-C Calculated: Credit: <br /> Occupancy Group Zf2C. ❑Everett School Dist ❑Mukilteo School Dist <br /> Occupancy Load Park Impact Fees for permits applied for after 1/1/2022: <br /> Fire Sprinklers: ❑Update Existing ❑New System ❑Not'Req'd Park Impact Fee Total$ / (net due after credit for existing uses) <br /> Reason Sprinklers Required: Fee Schedule Used For Calculation(Year): <br /> Fire Alarm: ❑Update Existing :New System [Not Req'd Permit Technician Use Only:Apply Phase-In Credit Per EMC19.53.200 <br /> Reason Fire Alarm Required: 0 100%Credit-Issued 1/1/2022-9/2/2022 <br /> RCW 64.55 MF worksheet req'd for permit? ❑Yes ❑ No 0 50%Credit-Issued 9/3/2022-6/2/2023 <br /> Add'I RCW 64.55 docs required prior to final? ❑Yes ❑No 0 0%Credit-Issued 6/3/2023 or later <br /> VALUATION CALCULATION: Total$S 1 a°• 6 J Additional Notes: (.01 I l3 <br /> )f) 1 fx4ha,t/L 1114/2s <br /> Approved By: Date: <br /> PUBLIC WORKS <br /> Additional Notes: Intake OK by: Date: <br /> Intake Comments: PW Worksheet Needed 1f <br /> ❑Sys Dev Eval(Util/SW)❑Traffic Mit Eval <br /> Approved Bak,z5,Z17 Date: C2 6/27/76 ❑Site Work/Drainage )]Address Letter <br /> ❑Backflow Prevention for high hazard: <br /> (dental,medical,animals,mortuary,hospital, <br /> FIRE DEPARTMENT supportive housing) <br /> Separate/Deferred Submittals Required: ❑Route this folder for PW Review at end --PW Review Worksheet <br /> ❑Fire Sprinklers ❑Fire Alarm ❑Other: ❑This project also has a separate concurrent PW Review(Green Folder) <br /> Additional Notes: AND ❑Create Green Folder ❑Submitted Previously ❑Deferred <br /> it-This Permit is Approved by Public Works <br /> J mpg <br /> Fire Dept.Fees: (IS( See PW Review Worksheet and associated attached items <br /> Cc,❑ Review of As-Built Plans-NO FIRE FEE ❑A Separate PW Permit is Required(Permit#: PW <br /> ❑ Minimal or No Fire Scope-NO FIRE FEE AND ❑ Is located in this folder <br /> ❑ Review/Inspection Scope-ADD FIRE FEE ❑ Is in a Separate Green Folder(join with this folder for permit issuance) <br /> Approved By: Date: ❑Will be issued separately(Separate Green Folder,PW issued ahead of Bldg) <br /> gPublic Works has no scope--PW Not Required <br /> EL.ECTRICAUPLUMBING Additional Notes: <br /> Additional Notes: <br /> Approved By: Date: Completed By'� �„ Date:vq /tej fzet <br />