My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1020 39TH ST 2025-06-24
>
Address Records
>
39TH ST
>
1020
>
1020 39TH ST 2025-06-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2025 11:38:15 AM
Creation date
4/9/2025 1:37:02 PM
Metadata
Fields
Template:
Address Document
Street Name
39TH ST
Street Number
1020
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> 3/19/2024 3/19/2024 BLDG 08-FRAMING RAKEEB KHAN APPROVAL as noted <br /> Notes: <br /> 3/18/2024 5:29 PM Nicole Rohlinger <br /> Contact Name:Nicole Rohlinger <br /> Site Address:1020 39TH ST <br /> Phone:4257375383 <br /> e-Mail:Nicole.rohlinger@gmail.com <br /> rfk changed Inspection Type from BLDG 16-FINAL to BLDG 08-FRAMING <br /> Dbl Ivl's and dbl 2x8's installed. <br /> 3/28/2024 3/28/2024 BLDG 12- RAKEEB KHAN APPROVAL <br /> INSULATION <br /> Notes: <br /> 3/18/2024 5:29 PM Nicole Rohlinger <br /> Contact Name:Nicole Rohlinger <br /> Site Address:1020 39TH ST <br /> Phone:4257375383 <br /> e-Mail:Nicole.rohlinger@gmail.com <br /> Insulation in floor above carport area. <br /> 4/9/2024 4/9/2024 BLDG 10-DRYWALL RAKEEB KHAN APPROVAL eTRAKiT Inspection Request <br /> NAILING <br /> Notes: <br /> 4/7/2024 9:32 AM Nicole Rohlinger <br /> Contact Name:Nicole Rohlinger <br /> Site Address:1020 39TH ST <br /> Phone:4257375383 <br /> e-Mail:Nicole.rohlinger@gmail.com <br /> 4/9/2024 4/9/2024 BLDG 16-FINAL RAKEEB KHAN APPRVD-PERMIT As noted <br /> FINAL <br /> Notes: <br /> Contact Name:Nicole Rohlinger <br /> Site Address:1020 39TH ST <br /> Phone:4257375383 <br /> e-Mail:Nicole.rohlinger@gmail.com <br /> Rescheduled from 4/11 to 4/9. <br /> Kitchen remodel to be under separate permit.All other work complete.OK to close out this permit. <br /> I <br /> Printed:Wednesday, 10 April, 2024 3 of 3 rk <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.