My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
931 BROADWAY SEPA 016 - 008 - TEUTSCH PARTNERS Geotech Report 2025-04-14
>
Address Records
>
BROADWAY
>
931
>
SEPA 016 - 008 - TEUTSCH PARTNERS
>
Geotech Report
>
931 BROADWAY SEPA 016 - 008 - TEUTSCH PARTNERS Geotech Report 2025-04-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2025 9:15:58 AM
Creation date
4/11/2025 8:26:51 AM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
931
Tenant Name
SEPA 016 - 008 - TEUTSCH PARTNERS
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geotechnical Report <br /> Proposed Student Housing: 931 Broadway Street, Everett, Washington <br /> December 8, 2015 <br /> • Earthwork should be performed in small areas to minimize subgrade exposure <br /> to wet weather. Excavation or the removal of unsuitable soil should be <br /> followed promptly by the placement and compaction of clean structural fill. <br /> The size and type of construction equipment used may have to be limited to <br /> prevent soil disturbance. <br /> • During wet weather, the allowable fines content of the structural fill should be <br /> reduced to no more than 5 percent by weight based on the portion passing the <br /> 0.75-inch sieve. The fines should be non-plastic. <br /> • The ground surface within the construction area should be graded to promote <br /> run-off of surface water and to prevent the ponding of water. <br /> • Geotextile silt fences should be installed at strategic locations around the site <br /> to control erosion and the movement of soil. <br /> • Excavation slopes and soils stockpiled on site should be covered with plastic <br /> sheeting. <br /> 6.4 EROSION CONSIDERATIONS <br /> Surface runoff can be controlled during construction by careful grading practices. <br /> Typically, this includes the construction of shallow, upgrade perimeter ditches or low <br /> earthen berms in conjunction with silt fences to collect runoff and prevent water from <br /> entering excavations or to prevent runoff from the construction area leaving the <br /> immediate work site. Temporary erosion control may require the use of hay bales on the <br /> downhill side of the project to prevent water from leaving the site and potential storm <br /> water detention to trap sand and silt before the water is discharged to a suitable outlet. <br /> All collected water should be directed under control to a positive and permanent <br /> discharge system. <br /> Permanent control of surface water should be incorporated in the final grading design. <br /> Adequate surface gradients and drainage systems should be incorporated into the design <br /> such that surface runoff is collected and directed away from the structure to a suitable <br /> outlet. Potential issues associated with erosion may also be reduced by establishing <br /> vegetation within disturbed areas immediately following grading operations. <br /> 15-275 931 Broadway,Everett Page PanGEO,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.