Laserfiche WebLink
1 <br /> I <br /> CZ <br /> Draft Memorandum Perteet <br /> 2707 Colby Avenue,Suite 900,Everett,WA 98201 I P 425.252.7700 I F 425.339.6018 <br /> ITo: David True, PMP <br /> June DeVoll <br /> IFrom: Darrell Smith,PE <br /> IDate: December 18,2015 <br /> Re: Seaway Transit Center—Traffic Engineering Support <br /> IIntroduction <br /> I Community Transit is planning to construct a transit center in Everett,Washington at the southeast corner of <br /> Seaway Boulevard and 75th Street SW in 2017.This transit center will be used exclusively for transit service by <br /> Community Transit, Everett Transit, King County Metro Transit, and Boeing Shuttles and will not provide <br /> I vehicular public access. The preferred preliminary design is shown in Figure 1, below. This memorandum <br /> supports the design and planning process by addressing several traffic engineering elements of work, including <br /> site access, traffic mitigation, and signal modifications.Though a formal traffic analysis is not required for this <br /> project, the existing and proposed signalized intersections within the study limits were evaluated due to the <br /> I <br /> unique configuration of the transit center and PUD driveways. <br /> I . <br /> 1 <br /> a r; <br /> 1 1 A\\ <br /> . .... iN,,, '', ‘‘‘', <br /> 7. <br /> i <br /> IFigure 1 — Preliminary Transit Center Layout <br /> Existing Conditions I <br /> Seaway Boulevard is a north south arterial with a terminus at State Route 526 (Boeing Freeway)that provides <br /> access to the Everett Boeing Plant via three locations.The first location is a northbound off-ramp that connects <br /> I Page I <br /> File location:X:\Community Transit\Projects\201 10155-Community Transit On-Call\.016-Seaway Transit Center Preliminary Engineering\Traffic\Submittals\02- <br /> Revision based on Katherine Casseday Comments\Seaway Transit Center -DRAFT Traffic Memorandum.docx <br />