Laserfiche WebLink
I <br /> I HCM 2010 Signalized Intersection Capacity Analysis <br /> 1: Seaway Boulevard & 75th Street SW 3/30/2015 <br /> I - - se 1- 4\ tP 1, 4/ <br /> Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br /> I Lane Configurations �� <br /> Volume(vph) 87 108 683 495 16 43 80 412 368 182 1346 45 <br /> Movement Number 7 4 14 3 8 18 5 2 12 1 6 16 <br /> I Initial Queue,veh 0 0 0 0 0 0 0 0 0 0 0 0 <br /> Fed Bike Adj.Factor(A_pbT) 1.00 1.00 1.00 0.79 1.00 1.00 1.00 1.00 <br /> Parking, Bus Adj. Factors 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br /> Adj.Sat. Flow Rate,veh/h/In 1900 1900 1900 1810 1810 1810 1759 1759 1759 1863 1863 1863 <br /> I Lanes 2 2 1 1 2 0 2 2 0 2 2 0 <br /> Lane Assignment <br /> Capacity,veh/h 750 771 345 368 387 258 147 595 531 281 1406 47 <br /> I Proportion Arriving On Green 0.21 0.21 0.21 0.21 0.21 0.21 0.05 0.36 0.36 0.08 0.39 0.39 <br /> Movement Delay,s/veh 44.7 44.9 583.2 277.4 43.9 45.5 67.2 48.3 49.3 64.1 36.4 87.7 <br /> Movement LOS D D F F DDEDDEF F <br /> Approach Volume,veh/h 954 602 935 1710 <br /> I Approach Delay,s/veh 463.7 252.7 50.5 84.4 <br /> Approach LOS F F D F <br /> Timer: 1 2 3 4 5 6 7 8 <br /> I Assigned Phase 1 2 8 4 5 6 <br /> Case No 2.0 4.0 10.0 9.0 2.0 4.0 <br /> Phase Duration(G+Y+Rc),s 16.45 55.00 34.50 34.50 11.36 60.09 <br /> I Change Period(Y+Rc),s 5.00 5.00 4.50 4.50 5.00 5.00 <br /> Max.Allowable Headway(MAH),s 6.36 7.86 4.13 3.36 7.33 7.86 <br /> Maximum Green Setting(Gmax),s 30.00 50.00 30.00 30.00 35.00 50.00 <br /> Max.Queue Clearance Time(g_c+11),s 9.87 35.14 32.00 32.00 5.69 57.09 I <br /> Green Extension Time(g_e),s 1.59 14.46 0.00 0.00 0.90 0.00 <br /> Probability of Phase Call(p_c) 1.000 1.000 1.000 1.000 0.966 1.000 <br /> Probability of Max Out(p_x) 0.004 0.986 1.000 1.000 0.000 1.000 <br /> 111 Assigned Movement 1 3 7 5 <br /> Mvmt.Sat Flow,veh/h 3441.64 1723.36 3510.48 3250.44 <br /> 1 Through Movement Data <br /> Assigned Movement 2 8 4 6 <br /> Mvmt. Sat Flow,veh/h 1671.30 1809.52 3610.00 3584.75 <br /> I Right-Tum Movement Data <br /> Assigned Movement 12 18 14 16 <br /> Mvmt.Sat Flow,veh/h 1491.59 1209.73 1615.00 119.63 <br /> ILeft Lane Group Data <br /> Assigned Movement 1 0 3 7 5 0 0 0 <br /> Lane Assignment L(Prot) L L L(Prot) <br /> 1 Lanes in Group 2 0 1 2 2 0 0 0 <br /> Group Volume(v),veh/h 197.8 0.0 538.0 94.6 87.0 0.0 0.0 0.0 <br /> Group Sat.Flow(s),veh/h/In 1720.8 0.0 1723.4 1755.2 1625.2 0.0 0.0 0.0 <br /> I Queue Serve Time(g_s),s 7.9 0.0 30.0 3.1 3.7 0.0 0.0 0.0 <br /> Cycle Queue Clear Time(g_c),s 7.9 0.0 30.0 3.1 3.7 0.0 0.0 0.0 <br /> No-Build Alt 3/13/2015 2038 PM Synchro 8 Report <br /> B.Powell Page 1 <br />