Laserfiche WebLink
Technical Memorandum Perteet <br /> 2707 Colby Avenue,Suite 900,Everett,WA 98201 1 P 425.252.7700 F 425.339.6018 <br /> Requirement Project Conformance/Method of Compliance <br /> wetland. <br /> 9. Operations and Community Transit will maintain all stormwater facilities <br /> Maintenance constructed within the project limits as part of this <br /> project. The City of Everett will maintain all stormwater <br /> facilities constructed within the City right-of-way as part <br /> of this project. An O&M Manual will be included in the <br /> Appendix of the final drainage report. <br /> Appendix E provides our current drainage plans and details for reference. These are only at a 60%design level <br /> currently. One important aspect to note is that the proposed detention vault location will be moved to the <br /> west and placed under the pavement area. This will occur during the 90% design. This move is necessary in <br /> order to avoid the exorbitant shoring costs that would be associated with installing a vault so close to the right- <br /> of-way. <br /> Page 6 <br /> File location: X:\Community Transit\Projects120110155-Community Transit On-Call\.016-Seaway Transit Center Preliminary <br /> Engineering\Design\Drainage\1_Threshold Analysis\TechMemo 06242016.docx <br />