Laserfiche WebLink
***********Groundwater Recharge Summary************* <br /> Recharge is computed as input to Perind Groundwater Plus Infiltration in Structures <br /> Total Predeveloped Recharge During Simulation <br /> Model Element Recharge Amount(ac-ft) <br /> Subbasin: CT Parcel 471.439 <br /> Link: POC 0.000 <br /> Total. 471.439 <br /> Total Post Developed Recharge During Simulation <br /> Model Element Recharge Amount(ac-ft) <br /> Subbasin. CT Parcel 115.745 <br /> Link: Vault 0.000 <br /> Link: POC 0.000 <br /> Total: 115.745 <br /> Total Predevelopment Recharge is Greater than Post Developed <br /> Average Recharge Per Year, (Number of Years= 158) <br /> Predeveloped: 2.984 ac-ft/year, Post Developed: 0.733 ac-ft/year <br /> ***********Water Quality Facility Data ************* <br /> SCENARIO: PREDEVELOPED <br /> Number of Links: 1 <br /> ********** Link: POC ********** <br /> Infiltration/Filtration Statistics <br /> Inflow Volume (ac-ft): 244.31 <br /> Inflow Volume Including PPT-Evap (ac-ft): 244.31 <br /> Total Runoff Infiltrated (ac-ft): 0.00, 0.00% <br /> Total Runoff Filtered (ac-ft): 0.00, 0.00% <br /> Primary Outflow To Downstream System (ac-ft): 244.31 <br /> Secondary Outflow To Downstream System (ac-ft): 0.00 <br /> Percent Treated (Infiltrated+Filtered)/Total Volume. 0.00% <br /> SCENARIO: POSTDEVELOPED <br /> Number of Links 2 <br /> ********** Link: Vault ********** <br /> Basic Wet Pond Volume (91% Exceedance): 9530. cu-ft <br /> Computed Large Wet Pond Volume, 1.5*Basic Volume. 14295. cu-ft <br /> 2-Year Discharge Rate • 0.030 cfs <br />