My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7505 SEAWAY BLVD SEPA 016 - 034 - SEAWAY TRANSIT CENTER Land Use Decision Documents 2025-04-22
>
Address Records
>
SEAWAY BLVD
>
7505
>
SEPA 016 - 034 - SEAWAY TRANSIT CENTER
>
Land Use Decision Documents
>
7505 SEAWAY BLVD SEPA 016 - 034 - SEAWAY TRANSIT CENTER Land Use Decision Documents 2025-04-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2025 7:47:29 AM
Creation date
4/11/2025 10:46:24 AM
Metadata
Fields
Template:
Address Document
Street Name
SEAWAY BLVD
Street Number
7505
Tenant Name
SEPA 016 - 034 - SEAWAY TRANSIT CENTER
Address Document Type
Land Use Decision Documents
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
runoff from the public Rights of Way, which adequately addresses the concerns about <br /> mixing public and private stormwater runoff. <br /> 2. The detention tank proposed for the public system is acceptable in concept with the caveat <br /> that steel pipe will not be accepted. <br /> 3. Oil control measures will be required for the bus traffic areas due to the high frequency of <br /> bus traffic. <br /> 4. The project shall demonstrate compliance with Minimum Requirement#5 for on-site <br /> stormwater management. <br /> 5. The City requires strict compliance with Ecology's General Use Level Designation (GULD) <br /> for Modular Wetland Systems proposed in the City of Everett. The GULD includes the <br /> requirement for site plan review and approval by the manufacturer to ensure that site <br /> grading and slope are appropriate for use of a MWS-Linear Modular Wetland. <br /> 6. Reconstruction of the traffic signal is necessary because the proximity of the two driveways <br /> requires that a signal traffic signal controller operates both traffic signals. <br /> 7. This project shall not be required to construct the northbound right turn lane improvement <br /> but no elements of the project shall be located within any portion of the Right-of-Way that <br /> Public Works deems necessary for the future construction of this improvement. <br /> .3/S <br />
The URL can be used to link to this page
Your browser does not support the video tag.