My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Jeremiah & Amy Nusbaum 4/2/2025
>
Contracts
>
Agreement
>
Other Agreements
>
Jeremiah & Amy Nusbaum 4/2/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2025 11:30:31 AM
Creation date
4/11/2025 11:30:17 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Jeremiah & Amy Nusbaum
Approval Date
4/2/2025
End Date
12/15/2025
Department
Public Works
Department Project Manager
Anne Weech
Subject / Project Title
Voluntary Compliance Agreement (VCA) CE22-1097 3110 16th ST Everett, WA 98201
Tracking Number
0004781
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
Other Agreements
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
will require review and approval by the city engineer. <br /> EMC 13.16.020 Improvement permit required. <br /> A. No person,firm or corporation shall remove, alter or construct any curb, <br /> sidewalk, driveway approach, gutter,pavement or other improvement in <br /> any public street, alley or other property owned by or dedicated to or used <br /> by the city and over which it has jurisdiction to regulate the matters covered <br /> hereby, without first obtaining a permit from the city engineer, and no <br /> permit shall be granted until the applicant shall file with the city engineer <br /> for his approval a copy of a drawing showing the location and size of all <br /> such proposed improvements to serve the property affected. <br /> *** <br /> Corrective Action(s) By: 12/15/2025 <br /> Required and <br /> Compliance Schedule • Submit complete permit applications to City of Everett Permit <br /> for Corrective Action(s) Services for all the necessary and required permits to correct all of <br /> the violations cited above. Information on the City of Everett permit <br /> application process and required documents can be found online at <br /> everettwa.gov/permits. <br /> • Once permits are obtained, correct and complete all of the <br /> deficiencies that are present. <br /> • Obtain final inspection approval by Permit Services for all <br /> permits. <br /> [remainder of page blank;Agreement continues on following page] <br /> Page 3 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.