Laserfiche WebLink
EXHIBIT A <br />PEMC MASTER PLAN FOR ECC PROPERTY <br />1.0 INTRODUCTION. <br />In December 2006, Providence Everett Medical Center ("PEMC") and Everett <br />Community College ("ECC") agreed to a purchase, sale and land exchange transaction <br />that would allow PEMC to acquire for hospital institutional development the ECC' <br />Physical Education Property, an area of approximately 9.36 acres in size that is north and <br />northeast of Block 248. The ECC Property is legally described as: <br />The Southwest Quarter of the Southwest Quarter of the <br />Northwest Quarter of Section 17, Township 29 North, <br />Range 5 East, W.M. lying North of 13'h Street, in <br />Snohomish County, Washington (the "ECC Property"). <br />In June 2007, PEMC applied for a Comprehensive Plan land use map amendment to <br />change the ECC Property designation to Hospitals (2.4) and a Zoning map amendment to <br />rezone such property R-2-I (Institutional Overlay), with a phased development Master <br />Plan for the ECC Property ("PEMC's 2007 Application). Included as part of PEMC's <br />2007 Application was a proposed Utility Building on the north end of the ECC Property <br />to provide heating, cooling, medical gas and emergency power for its medical facilities <br />on the existing Colby Campus and the ECC Property. <br />As a result of the public review process, including neighborhood meetings and the public <br />hearings before the City Planning Commission on April 7 and June 2, 2008, PEMC has <br />revised its original proposed Master Plan for the ECC Property to relocate the site of the <br />Utility Building south to a location south of the projected centerline of 12a' Street <br />(approximately 150 feet instead of 35 feet from the northern boundary of the ECC <br />Property), narrow the 175-foot height area by approximately 142 feet, reduce the total <br />allowable square footage for development (from 1 million to 850,000 square feet), and <br />