Laserfiche WebLink
Plan Review, Summary Comments, Dave Voigt, May 2, 2013: <br />1) Plans do not depict any of the extra manholes or pipe requested by the City to divert SD runoff <br />from the CUP site. The City wishes to pursue resolution of the two issues in item 4) above and if <br />determined to be workable, the City is requesting an opportunity to add the work to the project. <br />MKA would prepare designs and plans in coordination with the City. Mortensen Construction <br />would furnish a cost estimate (bid) for the work. <br />2) The new manhole (Detail 11 on C302) to be built on the existing City sewer is assumed to <br />become a City -owned structure. The plan detail suggests the existing pipe would be cut to install <br />the new MH base, whereas a saddle manhole base could be easier to install. The City would like <br />to review shop drawings for that structure and for the backwater valve. <br />3) See markups on plans for other miscellaneous and various items. <br />