Laserfiche WebLink
SAC: IINI). S.I'A UAL-A I/HI V L 1 lE MU W A AI I t1U/C. <br /> FOR$REFERENCE ONLY <br /> . AP* lir <br /> .., 10,N 4,,,,,,A, .4,0, # •i ' <br /> - ; <br /> . . <br /> ..... <br /> ,., <br /> #' '7V ,.... <br /> #7000 <br /> - <br /> Doss* <br /> •wI <br /> /4002 PIER � I .- ' <br /> 17000 or 7002 BOLT-ON TOP ( ' •--- <br /> 7' STEEL STRAP /7002 .- `:w" <br /> • 7' STEEL w /7000 7' STEEL <br /> BOLL <br /> TT &SPLIT NUT005 <br /> •W STRAP w/ / STRAP wf BUCKLE <br /> I HOLE <br /> �d /6005 SPLIT <br /> �o \ BOLT & Nut <br /> 16013 STABIL -.S% <br /> DRIVE ANCHOR :• • <br /> GROUND LINE .d'.!j` �`i ,ti•�. ;1.:,, <br /> op, k‘ <br /> 9 ir) <br /> p <br /> / 4\11 <br /> Ar <br /> •1Y <br /> \'4 . ,....._ f <br /> . <br /> DETAIL "A" a'-1, <br /> • VERTICAL OR ANGULAR INSTALLATION 18 OPTIONAL <br /> • STABIL-X DRIVE TIE DOWN <br /> SEE DETAIL"A" <br /> INSTALLATION INSTRUCTIONS <br /> 1. CONTRACTORS WARNING: CHECK FIRST FOR UNDERGROUND UTIUTIES. <br /> 2. DRIVE STABILIZER PLATE INTO GROUND. <br /> 3. DRIVE CROSS RODS THROUGH HEAD TUBES INTO SOIL AS SHOWN. <br /> 4. ATTACH STRAPS TO CHASSIS BEAM IN MANNER SHOWN. <br /> 5. IF ANGLE OF SIDE STRAP IS GREATER THEN 60°,STRAP CONNECTION CAN BE <br /> MADE FROM ANCHOR TO OPPOSITE CHASSIS BEAM. ' 4 - ♦ <br /> 6. INSERT STRAP THROUGH SPLIT BOLT. CUT OFF EXCESS STRAP AND TIGHTEN f <br /> BOLT UNTIL STRAP IS SNUG. <br /> 7. #6002 ANCHOR CAN BE USED WHERE HARD OR ROCKY SOIL OCCURS.IF THE <br /> GROUND SURFACE IS OTHER'THAN ROCKY SOIL OR MINIMUM 2•'ASPHALT, USE #6002 <br /> STABIL-X ANCHOR OR ENCASE ANCHOR WITH 12'k1Tx12'CUBE OF CONCRETE, SEE NOTE#7 <br /> • <br /> 8. WHEN#6002 ANCHOR IS USED FOR ANY REQUIRED ANCHOR—(2)ANCHORS SEE NOTE#6 <br /> MUST BE USED AT THAT LOCATION. <br /> EARTH AUGERS CROSS DRIVE ANCHORS CONCRETE SLAB ANCHORS <br /> MAIL HOME 38' 64' T2' MAIL LE*711110F HO 4p 1WAX o °� 34' 42'-50' 59' 68' <br /> mulct*EDOI Fa 2 3 4 m 2 3 4 aNCIOFwoe <br /> 4 5 6 7 8 <br /> ,>E aowNa _ - - <br /> NOTE: <br /> SIDE TIE—DOWNS: MUST BE WITHIN 24" OF THE END OF THE CHASSIS BEAM. <br /> WO TIE—DOWNS: CAN BE LOCATED WITHIN 24" OF EITHER SIDE OF CHASSIS BEAM ONE TIE—DOWN IS <br /> MANDATORY AT EACH END OF "I-BEAM (SEE PAGE #1 GENERAL NOTE #5). <br /> IF SIDE WALL TiE-DOWN GROUND ANCHOR LOCATION IS SUCH THAT THE ANGLE BETWEEN THE GROUND AND <br /> STRAP EXCEEDS 60•, CONNECT THE TIE STRAP TO THE INSIDE CHASSIS BEAM ON DOUBLE AND TRIPLE WIDES <br /> AN)?/0 !1 THE OPPOSITE CHASSIS BEAM ON SINGLE WIDES. <br /> Boeing Flightline Stall 113 Page 151 <br />