My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD BLDG 45-05 2025-04-14
>
Address Records
>
W CASINO RD
>
3003
>
BLDG 45-05
>
3003 W CASINO RD BLDG 45-05 2025-04-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2025 7:51:54 AM
Creation date
4/14/2025 7:46:39 AM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BLDG 45-05
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
m1`Ti <br /> Hilts PROFIS Engineering 3.0.40 <br /> www.hitti.com <br /> • <br /> Company: Page: 8 <br /> Address: Specifier: <br /> Phone I Fax: i E-Mall: <br /> Design: Work Shed column B1 Date: 4/3/2019 <br /> Fastening point: <br /> 6 Warnings <br /> • The anchor design methods in PROFIS Engineering require rigid anchor plates per current regulations(ETAG 001/Annex C,EOTA TR029,etc), <br /> This means load re-distribution on the anchors due to elastic deformations of the anchor plate are not considered-the anchor plate is assumed <br /> to be sufficiently stiff,In order not to be deformed when subjected to the design loading.PROFIS Engineering calculates the minimum required <br /> anchor plate thickness with FEM to limit the stress of the anchor plate based on the assumptions explained above,The proof if the rigid anchor <br /> plate assumption is valid Is not carried out by PROFIS Engineering. Input data and results must be checked for agreement with the existing <br /> conditions and for plausibility! <br /> • Condition A applies where the potential concrete failure surfaces are crossed by supplementary reinforcement proportioned to tie the potential <br /> concrete failure prism into the structural member.Condition B applies where such supplementary reinforcement is not provided,or where pullout <br /> or pryout strength governs. <br /> • For additional information about ACI 318 strength design provisions,please go to httpsl/submittals us.hilti.com/PROFISAnchorDesignGulde/ <br /> • An anchor design approach for structures assigned to Seismic Design Category C,D, E or F Is given in ACI 31 B-14,Chapter 17,Section <br /> 17.2.3.4.3(a)that requires the governing design strength of an anchor or group of anchors be limited by ductile steel failure.If this Is NOT the <br /> case,the connection design(tension)shall satisfy the provisions of Section 17.2,3,4.3(b),Section 17.2.3.4.3(c),or Section 17.2.3.4.3(d).The <br /> connection design(shear)shall satisfy the provisions of Section 17.2.3.5.3(a),Section 17.2.3.5.3(b),or Section 17.2.3.5.3(c). <br /> • Section 17.2.3.4.3(b)/Section 17.2.3.5.3(a)require the attachment the anchors are connecting to the structure be designed to undergo ductile <br /> yielding at a load level corresponding to anchor forces no greater than the controlling design strength.Section 17.2.3.4.3(c)/Section 17.2.3.5.3 <br /> (b)waive the ductility requirements and require the anchors to be designed for the maximum tension/shear that can be transmitted to the <br /> anchors by a non-yielding attachment.Section 17.2,3.4.3(d)/Section 17.2.3.5.3(c)waive the ductility requirements and require the design <br /> strength of the anchors to equal or exceed the maximum tension/shear obtained from design load combinations that Include E,with E increased <br /> by wo. • <br /> Fastening meets the design criteria! <br /> is o — <br /> Input data one rewRa must be checked for canlcrtnry w�Ci the merry conditions and to p1atttiD2iry1 <br /> PROFIS Englneertng(c)2003-2009 HiS AG FL-9494 Semen Hilt Is a regatared Trademark of Hit9 AG.Sdaan <br /> 8 <br /> 04/05/19 Boeing Flightline Stall 113 Page 86 <br />
The URL can be used to link to this page
Your browser does not support the video tag.