Laserfiche WebLink
I <br /> g. Will the proposal interfere with, affect or be affected by the movement of agricultural and <br /> forest products on roads or streets in the area? If so, generally describe. <br /> Not applicable. <br /> h. Proposed measures to reduce or control transportation impacts, if any: <br /> Any transportation impact fees that are levied by the City of Everett will be paid at the necessary <br /> times. <br /> 15. Public Services <br /> a. Would the project result in an increased need for public services (for example: fire protection, <br /> police protection, public transit, health care, schools, other)? If so, generally describe. <br /> The proposed project will not result in much of an impact of public services. <br /> b. Proposed measures to reduce or control direct impacts on public services, if any. <br /> Any impact fees levied upon the project will be paid at the time of building permit. <br /> 16. Utilities <br /> a. Circle utili <br /> c ricity, natural gas, water, refuse service, telephone, sanitary sev"I septic system, <br /> c. Describe the utilities that are proposed for the project, the utility providing the service, <br /> and the general construction activities on the site or in the immediate vicinity which might <br /> be needed. <br /> As this proposal does not involve a building, only minimal utilities will be needed. <br /> C. Signature <br /> The above answers are true and complete to the best of my knowledge. I understand that the <br /> lead agency is relying on them to male its decision. <br /> �`2 :, �"/;i <br /> Signature: c / ," <br /> Name of signee Brian Kalab <br /> Position and Agency/Organization President— Insight Engineering Company <br /> Date Submitted: (. / I <br /> SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 12 of 12 <br />