Laserfiche WebLink
• <br /> 3. Address and phone number of applicant and contact person: <br /> Applicant: 11625 Airport Rd., Everett, WA 98201 <br /> Contact: Insight Engineering, P.O. Box 1478, Everett, WA 98206 (425) 303-9363 <br /> 4. Date checklist prepared: <br /> March 6, 2018 <br /> 5. Agency requesting checklist: <br /> City of Everett <br /> 6. Proposed timing or schedule (including phasing, if applicable): <br /> Project will be completed in one phase <br /> 7. Do you have any plans for future additions, expansion, or further activity related to or <br /> connected with this proposal? If yes, explain. <br /> No future plans beyond the proposed phase at this time. <br /> 8. List any environmental information you know about that has been prepared, or will be <br /> prepared, directly related to this proposal. <br /> Draingage report, SEPA checklist, wetland study <br /> 9. Do you know whether applications are pending for governmental approvals of other <br /> proposals directly affecting the property covered by your proposal? If yes, explain. <br /> None known. <br /> 10. List any government approvals or permits that will be needed for your proposal, if known. <br /> SEPA approval, Stormwater approval, Landscape Plan approval, Clearing/Grading approval, <br /> Construction approval, site plan approval. <br /> 11. Give brief, complete description of your proposal, including the proposed uses and the size <br /> of the project and site. There are several questions later in this checklist that ask you to <br /> describe certain aspects of your proposal. You do not need to repeat those answers on this <br /> page. (Lead agencies may modify this form to include additional specific information on project <br /> description.) <br /> Construct a 93-space parking lot on a 1.89 acre parcel. <br /> 12. Location of the proposal. Give sufficient information for a person to understand the precise <br /> location of your proposed project, including a street address, if any, and section, township, and <br /> range, if known. If a proposal would occur over a range of area, provide the range or <br /> boundaries of the site(s). Provide a legal description, site plan, vicinity map, and topographic <br /> map, if reasonably available. While you should submit any plans required by the agency, you <br /> are not required to duplicate maps or detailed plans submitted with any permit applications <br /> related to this checklist. <br /> 116xx Airport Road, Everett, WA 98204, Sec. 23, T. 28N, R. 04E., W.M. <br /> B. Environmental Elements <br /> SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 2 of 12 <br />