My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11625 AIRPORT RD SEPA 018 - 010 - SONRISE CHRISTIAN CENTER Land Use Decision Documents 2025-04-15
>
Address Records
>
AIRPORT RD
>
11625
>
SEPA 018 - 010 - SONRISE CHRISTIAN CENTER
>
Land Use Decision Documents
>
11625 AIRPORT RD SEPA 018 - 010 - SONRISE CHRISTIAN CENTER Land Use Decision Documents 2025-04-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 2:28:04 PM
Creation date
4/14/2025 2:28:01 PM
Metadata
Fields
Template:
Address Document
Street Name
AIRPORT RD
Street Number
11625
Tenant Name
SEPA 018 - 010 - SONRISE CHRISTIAN CENTER
Address Document Type
Land Use Decision Documents
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> b. Are there any off-site sources of emissions or odor that may affect your proposal? If so, <br /> generally describe. <br /> None known. <br /> c. Proposed measures to reduce or control emissions or other impacts to air, if any: <br /> Construction Impact Mitigation: The Washington Clean Air Act requires the use of all known, <br /> available, and reasonable means of controlling air pollution, including dust. Construction impacts <br /> would not be significant and the potential for soils to be carried off the site by exiting trucks could <br /> be controlled with the construction of a gravel entrance. Additionally, equipment used for site <br /> preparation will be serviced and maintained in good operation condition to lessen impacts from <br /> this source. Water will also be used for dust control when necessary. <br /> Long-Term Air Quality Mitigation: Long-term air quality impacts are not expected to exceed <br /> regulated amounts <br /> 3. Water <br /> a. Surface Water: <br /> 1) Is there any surface water body on or in the immediate vicinity of the site (including <br /> year-round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe <br /> type and provide names. If appropriate, state what stream or river it flows into. <br /> Yes, there is a category 2 wetland and an NP stream onsite. <br /> 2) Will the project require any work over, in, or adjacent to (within 200 feet) the described <br /> waters? If yes, please describe and attach available plans. <br /> Yes, the work will occur adjacent to the waters, but not over or within them. <br /> 3) Estimate the amount of fill and dredge material that would be placed in or removed <br /> from surface water or wetlands and indicate the area of the site that would be affected. <br /> Indicate the source of fill material. <br /> No fill and dredge will be required. <br /> 4) Will the proposal require surface water withdrawals or diversions? Give general <br /> description, purpose, and approximate quantities if known. <br /> It will not. <br /> 5) Does the proposal lie within a 100-year floodplain? If so, note location on the site plan. <br /> It does not. <br /> 6) Does the proposal involve any discharges of waste materials to surface waters? If so, <br /> describe the type of waste and anticipated volume of discharge. <br /> Waste materials would not be discharged into surface waters as a result of this project. <br /> b. Ground Water: <br /> 1) Will groundwater be withdrawn from a well for drinking water or other purposes? If so, <br /> give a general description of the well, proposed uses and approximate quantities <br /> SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 4 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.