Laserfiche WebLink
i <br /> a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to meet <br /> the completed project's energy needs? Describe whether it will be used for heating, <br /> manufacturing, etc. <br /> No energy needs will be produced by the project. <br /> b. Would your project affect the potential use of solar energy by adjacent properties? <br /> If so, generally describe. <br /> It will not. <br /> c. What kinds of energy conservation features are included in the plans of this proposal? <br /> List other proposed measures to reduce or control energy impacts, if any: <br /> Not applicable. <br /> 7. Environmental Health <br /> a. Are there any environmental health hazards, including exposure to toxic chemicals, risk <br /> of fire and explosion, spill, or hazardous waste, that could occur as a result of this proposal? <br /> If so, describe. <br /> The project would not create any permanent environmental health hazards. Any accidents that <br /> may occur during construction would be cleaned to preserve the existing environment <br /> 1) Describe any known or possible contamination at the site from present or past uses. <br /> None known. <br /> 2) Describe existing hazardous chemicals/conditions that might affect project development <br /> and design. This includes underground hazardous liquid and gas transmission pipelines <br /> located within the project area and in the vicinity. <br /> No hazardous chemicals or conditions known. <br /> 3) Describe any toxic or hazardous chemicals that might be stored, used, or produced <br /> during the project's development or construction, or at any time during the operating <br /> life of the project. <br /> None would be used. <br /> 4) Describe special emergency services that might be required. <br /> Hazardous waste cleanup of any fuel spillage associates with construction of this proposal. <br /> 5) Proposed measures to reduce or control environmental health hazards, if any: <br /> None. <br /> b. Noise <br /> 1) What types of noise exist in the area which may affect your project (for example: <br /> traffic, equipment, operation, other)? <br /> Traffic on existing roads near the site would be audible. There are no other sources of noise <br /> that would affect the project. <br /> SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 7 of 12 <br />