Laserfiche WebLink
CONCRETE COMPRESSIVE STRENGTH TEST REPORT MAYES I Irerracon <br />Report Number: M7231404.0004A <br />' <br />Service Date: 06/15/23 <br />20225 Cedar Valley Rd Ste 110 <br />Report Date: 06/23/23 <br />Lynnwood, WA 98036-6365 <br />Task: <br />425-742-9360 <br />Client <br />Project - M7231404 <br />Brixton Everett LLC <br />Everett Mall Redevelopment <br />Attn: Kyle Godat <br />1402 SE Everett Mall Way <br />120 S Sierra Ave <br />Everett, WA <br />Solana Beach, CA 92075 <br />Permit No.: B2208-032 <br />Material Information <br />Sample Information <br />Specified Strength: 4,000 <br />psi @ 28 <br />days Sample Date: <br />06/15/23 Sample Time: 1130 <br />Sampled By: <br />Randal Dohrman <br />Mix ID: 0340 <br />Weather Conditions: <br />Inside <br />Supplier: Smokey Pointe <br />Ready mix <br />Accumulative Yards: <br />10 Batch Size (cy): 10 <br />Batch Time: 1030 <br />Plant: <br />603R Placement Method: <br />Direct Discharge <br />Truck No.: 3368 <br />Ticket No.: <br />306643 Water Added Before (gal): <br />0 <br />Water Added After (gal): <br />0 <br />Field Test Data <br />Sample Location: <br />loading dock stem wall <br />Test <br />Result <br />Specification Placement Location: <br />loading dock stem wall <br />Slump (in): <br />5 <br />Sample Description: <br />4-inch diameter cylinders <br />Air Content (%): <br />Concrete Temp. (F): <br />73 <br />Ambient Temp. (F): <br />65 <br />Plastic Unit Wt. (pcf): <br />Yield (Cu. Yds.): <br />Laboratory Test Data <br />Age at Max <br />Comp <br />Set Spec Cyl. <br />Avg Diam. <br />Area Date Date Test Load <br />Strength Frac Tested <br />No. ID Cond. <br />(in) <br />(sq in) Received Tested (days) (Ibs) <br />(psi) Type By <br />1 1 Good <br />4.00 <br />12.57 06/16/23 06/22/23 7 571700 <br />41590 2 JAM <br />1 2 <br />06/16/23 07/13/23 28 <br />1 3 <br />06/16/23 07/13/23 28 <br />1 4 <br />06/16/23 07/13/23 28 <br />Initial Cure: Cure Box <br />Final Cure: Moist Room <br />Comments: Not tested for plastic unit weight. <br />Samples Made By: Mayes/Terracon <br />Services: Special Inspections / Materials Testing <br />Mayes/Terracon Rep.: Randal Dohrman <br />Reported To: Bayley Construction <br />Contractor: Bayley Construction <br />Report Distribution: <br />(1) Brixton Everett LLC, Kyle Godat (1) Bayley Construction, Tony Betz <br />(1) City of Everett WA, Permit Services (1) Mayes Testing Engineers, Inc, Donna <br />Pollard <br />(1) Mayes Testing Engineers, Inc, Mike (1) Smokey Point Concrete Inc, Jasper Smith <br />Mattox <br />Reviewed By: <br />Barry Tuttle <br />Project Field Manager <br />Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 <br />The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be <br />reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and <br />are not necessarily indicative of the properties of other apparently similar or identical materials. <br />CRoo01, 3-31-22, Rev.7 Page 1 of 1 <br />