Laserfiche WebLink
MASONRY OBSERVATIONS REPORT <br />MAYES lferracon <br />Report Number: M7231404.0008 <br />Service Date: 07/11/23 <br />Report Date: 07/12/23 <br />Client <br />Brixton Everett LLC <br />Attn: Kyle Godat <br />120 S Sierra Ave <br />Solana Beach, CA 92075 <br />Permit No.: B2208-032 <br />20225 Cedar Valley Rd Ste 110 <br />Lynnwood, WA 98036-6365 <br />425-742-9360 <br />Project <br />Everett Mall Redevelopment <br />1402 SE Everett Mall Way <br />Everett, WA <br />Project Number: M7231404 <br />General Information <br />Bayley Construction requested Mayes Terracon be on site for grout observation of the walls, which are being <br />constructed by R & D Masonry. Mayes Terracon representative arrived on site at 0830 and departed at 1030. <br />The construction documents referenced for this inspection include the on -site approved plans. <br />Grout Observations <br />Construction Masonry Grout Cleanouts Consolidation <br />Elevation / Location <br />Production <br />Status <br />Type Type Technique Provided Method <br />Methods <br />Walls CMU 0 to 5'2" / grid lines Low Lift NA Vibration <br />Smoky Point Complies <br />E/4-6 and E/7-9 <br />concrete mix <br />PG65030 <br />No strength specimens were cast. <br />Additional Comments <br />The inspected reinforcing was per masonry details of S2.1. <br />The results of observation(s) for today were reported to Bayley Construction. <br />Compliance Statement <br />Based on our observations, masonry activities observed at the above -referenced locations appeared to be <br />completed in general accordance with the project plans and specifications. <br />Services: Special Inspections / Materials Testing <br />Mayes/Terracon Rep.: David Bernier <br />Reported To: Bayley Construction <br />Contractor: Bayley Construction <br />Report Distribution: <br />(1) Brixton Everett LLC, Kyle Godat (1) Bayley Construction, Tony Betz <br />(1) City of Everett WA, Permit Services (1) Mayes Testing Engineers, Inc, <br />(1) Mayes Testing Engineers, Inc, Mike Donna Pollard <br />Mattox <br />Reviewed By: '_. V_ )_.___ <br />�/ Barry Tuttle <br />Project Field Manager <br />The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above <br />and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at <br />the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. <br />D11014, 04-29-22 Rev.5 Page 1 of 1 <br />