My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1302 SE EVERETT MALL WAY ULTA 2025-07-31
>
Address Records
>
SE EVERETT MALL WAY
>
1302
>
ULTA
>
1302 SE EVERETT MALL WAY ULTA 2025-07-31
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2025 2:24:45 PM
Creation date
4/14/2025 2:30:58 PM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
1302
Tenant Name
ULTA
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
296
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
POST -INSTALLED ANCHORS REPORT <br />MAYES lferracon <br />Report Number: M7231404.0012 <br />Service Date: 08/08/23 <br />Report Date: 08/11/23 <br />Client <br />Brixton Everett LLC <br />Attn: Kyle Godat <br />120 S Sierra Ave <br />Solana Beach, CA 92075 <br />Permit No.: B2208-032 <br />20225 Cedar Valley Rd Ste 110 <br />Lynnwood, WA 98036-6365 <br />425-742-9360 <br />Project <br />Everett Mall Redevelopment <br />1402 SE Everett Mall Way <br />Everett, WA <br />Project Number: M7231404 <br />General Information <br />Bayley Construction requested Mayes Terracon be on site for observation of the adhesive anchors being installed <br />by Evergreen Erectors. <br />The construction documents referenced for this observation include the structural plan. <br />Anchor System Information <br />The following adhesive types were used during today's observation: <br />Adhesive ICC Report Adhesive Lot No. Exp. Date Time Until Referenced <br />No. Full Cure <br />1 2508 Simpson SET XP 1000338910 03/01/25 48 hours Ironworker shop drawings <br />Anchor Installation <br />Anchor installation was observed as follows, utilizing the adhesive(s) noted above: <br />Adhesive Time Locations Quantity Anchor Length & Spacing & Edge Status <br />No. Installed Size & Type Embedment Distance <br />1 1000 Anchor bolts at columns 20 3/4" all -thread 9" & 4-1/2" N/A & centered Complies <br />for Trader Joe's canopy for in wall <br />covered loading dock <br />Holes were cleaned prior to installation using compressed air and brush. Ambient temperature during observation <br />was 66°F. <br />Compliance <br />Based on our observations and testing, the post -installed anchors referenced above appear to be in general <br />accordance with the project documents. <br />Services: Special Inspections / Materials Testing <br />Mayes/Terracon Rep.: Barry Tuttle <br />Reported To: Bayley Construction <br />Contractor: Bayley Construction <br />Report Distribution: <br />(1) Brixton Everett LLC, Kyle Godat (1) Bayley Construction, Tony Betz <br />(1) City of Everett WA, Permit Services (1) Mayes Testing Engineers, Inc, <br />(1) Mayes Testing Engineers, Inc, Mike Donna Pollard <br />Mattox <br />Reviewed By: '_. V_ )_.___ <br />�/ Barry Tuttle <br />Project Field Manager <br />The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above <br />and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at <br />the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. <br />D11018, 04-29-22, Rev. 5 Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.