My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2201 EVERETT AVE SEPA 018 - 008 Land Use Decision Documents 2025-04-23
>
Address Records
>
EVERETT AVE
>
2201
>
SEPA 018 - 008
>
Land Use Decision Documents
>
2201 EVERETT AVE SEPA 018 - 008 Land Use Decision Documents 2025-04-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2025 7:45:07 AM
Creation date
4/14/2025 3:24:39 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERETT AVE
Street Number
2201
Tenant Name
SEPA 018 - 008
Address Document Type
Land Use Decision Documents
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f. How many vehicular trips per day would be generated by the completed project or proposal? <br />If known, indicate when peak volumes would occur and what percentage of the volume would <br />be trucks (such as commercial and nonpassenger vehicles). What data or transportation <br />models were used to make these estimates? <br />See the attached Parking and Trip Generation Calculations prepared by Gibson <br />Traffic Consultants Inc <br />g. Will the proposal interfere with, affect or be affected by the movement of agricultural and <br />forest products on roads or streets in the area? If so, generally describe. <br />No. <br />h. Proposed measures to reduce or control transportation impacts, if any: <br />Payment of necessary traffic mitigation fees as determined by governing authorities. <br />15. Public Services hf eM <br />a. Would the project result in an increased need for public services (for example: fire protection, <br />police protection, public transit, health care, schools, other)? If so, generally describe. <br />No. <br />b. Proposed measures to reduce or control direct impacts on public services, if any. <br />Impact fees as may be required at issuance of building permits. Additional impacts will be <br />addressed through taxes and special levies as they occur. <br />16. Utilities hf elpl <br />a. Circle utilities currently available at the site: <br />electricity, natural gas, water, refuse service, telephone, sanitary sewer, septic system, <br />other <br />e. Describe the utilities that are proposed for the project, the utility providing the service, <br />and the general construction activities on the site or in the immediate vicinity which might <br />be needed. <br />Electricity: <br />Water & Sanitary Sewer. - <br />Natural Gas: <br />Cable: <br />Telephone: <br />Snohomish County PUD <br />City of Everett <br />Puget Sound Energy <br />Frontier <br />Frontier <br />C. Signature HELP <br />The above answers are true and complete to the best of my knowledge. I understand that the <br />lead agency is relying on them to make its decision. <br />SEPA Environmental checklist (WAC 197-11-960) July 2016 Page 13 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.