My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2201 EVERETT AVE SEPA 018 - 008 Land Use Decision Documents 2025-04-23
>
Address Records
>
EVERETT AVE
>
2201
>
SEPA 018 - 008
>
Land Use Decision Documents
>
2201 EVERETT AVE SEPA 018 - 008 Land Use Decision Documents 2025-04-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2025 7:45:07 AM
Creation date
4/14/2025 3:24:39 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERETT AVE
Street Number
2201
Tenant Name
SEPA 018 - 008
Address Document Type
Land Use Decision Documents
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
w � <br /> on the approved plans at the time of building permit issuance and the ordinance in effect at that <br /> time. <br /> 8. Stormwater shall be managed in accordance with the City's 2010 Storm water Management <br /> Manual". <br /> 9. The driveways on Everett Avenue must be removed and replaced with curb, gutter and sidewalk <br /> per City standards. <br /> 10. Approval of construction plans will require demonstration that all pertinent standards and <br /> regulations are met. <br /> 11. A fire hydrant is required within the side of the street of the storage building. The hydrant(s) <br /> must meet City specifications. <br /> 12. City streets and alleys are to be kept clear of dirt and debris at all times during construction. <br /> Dust suppression and street cleaning must occur as directed by the Public Works Inspector. <br /> 13. A one year warranty is required on the public improvement for an amount not less than 10% of <br /> the cost of construction and shall run for one year from the date of final approval/issuance of the <br /> first Occupancy Permit. <br /> 14. Lack of comment on the plans submitted with the application does not constitute approval of <br /> these plans. <br /> 15. As-builts of storm sewer, sanitary sewer, and water systems will be required to be submitted per <br /> City Design and Construction Standards and Specifications for Development. <br /> 16. Any broken or damaged sidewalk shall be repaired/replaced per the City Public Works <br /> Inspector. <br /> 17. The construction plans must be designed from a site survey performed by a licensed State of <br /> Washington land surveyor. <br /> 18. All exposed ground must be reseeded within 30 days of the completion of construction. If <br /> reseeding is not practical due to weather or seasonal problems, the ground must be covered with <br /> mulch as directed by the City Engineer. <br /> 19. Temporary erosion control measures for construction activity must be operational prior to <br /> commencement of any clearing or earthwork. <br />
The URL can be used to link to this page
Your browser does not support the video tag.