Laserfiche WebLink
boundaries of the site(s). Provide a legal description, site plan, vicinity map, and topographic <br />map, if reasonably available. While you should submit any plans required by the agency, you <br />are not required to duplicate maps or detailed plans submitted with any permit applications <br />related to this checklist. <br />Project Address: <br />2201 Everett Ave, Everett, Wa 98201 <br />Legal Description: <br />RUCKERS 3RD PLAT BLK 606 D-02 - TH N 50FT OF LOTS 10-13 INCL ALSO ALL OF <br />LOTS 14 & 15TGW PTN VAC MCDOUGALL ST & PTN VAC ALLEYPER CITY OF EV <br />ORD 1894-92 REC A NO 9301220047 <br />B. Environmental Elements rHELP1 <br />1. Earth lbel <br />a. General description of the site: <br />(circle one): Flat rolling, hilly, steep slopes, mountainous, other <br />b. What is the steepest slope on the site (approximate percent slope)? <br />2% <br />c. What general types of soils are found on the site (for example, clay, sand, gravel, peat, <br />muck)? If you know the classification of agricultural soils, specify them and note any <br />agricultural land of long-term commercial significance and whether the proposal results in <br />removing any of these soils. <br />ALDERWOOD-URBAN LAND COMPLEX, 2 TO 8 PERCENT SLOPES <br />d. Are there surface indications or history of unstable soils in the immediate vicinity? If so, <br />describe. <br />None <br />e. Describe the purpose, type, total area, and approximate quantities and total affected area of <br />any filling, excavation, and grading proposed. Indicate source of fill. <br />Since the site is generally flat, we anticipate 750 cu. yds. of excavation will be required to <br />construct the building. Every attempt will be made to balance cut and fill operations on site so <br />that off -site import/export will be minimized. Export soil will be transported to a legal, local <br />dump site of the contractors choice <br />f. Could erosion occur as a result of clearing, construction, or use? If so, generally describe. <br />No <br />g. About what percent of the site will be covered with impervious surfaces after project <br />construction (for example, asphalt or buildings)? <br />SEPA Environmental checklist (WAC 197-11-960) July 2016 Page 3 of 14 <br />