Laserfiche WebLink
Construction Stormwater Pollution Prevention Plan Checklist <br /> Project Name: <br /> City Reference No. <br /> Construction Permit No. <br /> Review Date: <br /> On-site Inspection Review Date: <br /> Construction SWPPP Reviewer: <br /> Section I—Construction SWPPP Narrative <br /> Construction Stormwater Pollution Prevention Elements <br /> 1. Describe how each of the Construction Stormwater Pollution Prevention Elements <br /> has been addressed though the Construction SWPPP. <br /> 2. Identify the type and location of BMPs used to satisfy the required element. <br /> 3. Provide written justification identifying the reason an element is not applicable to the <br /> proposal. <br /> Thirteen Required Elements-Construction Stormwater Pollution Prevention Plan <br /> 1. Mark Clearing Limits <br /> 2. Establish Construction Access <br /> 3. Control Flow Rates <br /> 4. Install Sediment Controls <br /> 5. Stabilize Soils <br /> 6. Protect Slopes <br /> 7. Protect Drain Inlets <br /> 8. _Stabilize Channels and Outlets <br /> 9. _Control Pollutants <br /> 10._Control De-Watering <br /> 11._Maintain BMPs <br /> 12. Manage the Project <br /> 13. Protect Low Impact Development BMPs <br /> Project Description <br /> 1. _Total project area <br /> 2. Total proposed impervious area <br /> 3. _Total proposed area to be disturbed, including off-site borrow and fill areas <br /> 4. Total volumes of proposed cut and fill <br /> Volume II—Construction Stormwater Pollution Prevention-December 2014 <br /> 3-28 <br />