Laserfiche WebLink
credited against the project's sewer connection charge(EMC 14.08.135)No additional <br /> BMPS are proposed. <br /> OPERATION AND MAINTENANCE <br /> Maintenance of the downspouts bioretention areas and conveyance system should be on a <br /> yearly basis and after heavy rain storms. Pipes and yard/or catch basins that have more <br /> than 2 inches of sediment should be cleaned regularly. For additional information see the <br /> Attached Operation and Maintenance Manual. <br /> EARTHWORK: (Note: Haul off cut maybe required pending site conditions) <br /> Asphalt&walks Cut= 1.0' deep x(23,522 sf)/(27 cu ft/yd) = 871 cu yds <br /> Building Cut=2.0' deep x (18,500 sf)/(27 cu ft/yd) = 1,370 cu yds <br /> Total = 2,241 cu yds <br />