Laserfiche WebLink
4 , . <br /> Description of Project <br /> 5200 Evergreen Way <br /> Historic gasoline tanks on site leaked petroleum into the subsurface contaminating soil and intermittent <br /> ground water.The project will include partial demolition of an onsite building to allow for soil and <br /> ground water remediation.After demolition of the building, temporary piling support will be installed on <br /> the adjacent buildings to allow for excavation immediately adjacent to the structures.After completion <br /> of contaminated soil removal, the excavation will be backfilled with clean overburden from the <br /> excavation and structural backfill.The area of excavation will be paved and used as lot sales storage <br /> following completion of the project.The northern half of the building for demolition will remain and be <br /> finished to match the facade of the existing structure. <br /> c-)/ i <br /> a <br />