My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5200 EVERGREEN WAY SEPA 017 - 010 Land Use Decision Documents 2025-04-15
>
Address Records
>
EVERGREEN WAY
>
5200
>
SEPA 017 - 010
>
Land Use Decision Documents
>
5200 EVERGREEN WAY SEPA 017 - 010 Land Use Decision Documents 2025-04-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 8:49:18 AM
Creation date
4/15/2025 8:48:41 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
5200
Tenant Name
SEPA 017 - 010
Address Document Type
Land Use Decision Documents
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
This is not an applicable question because there are no surface water features within 300 feet of the <br /> Property. The proposal does not involve any discharges of waste materials to surface waters, <br /> b. Ground Water: <br /> 1)Will groundwater be withdrawn from a well for drinking water or other purposes?If so,give a <br /> general description of the well, proposed uses and approximate quantities withdrawn from the <br /> well.Will water be discharged to groundwater?Give general description, purpose,and <br /> approximate quantities if known. <br /> No. There will be no groundwater withdrawn from a well during the proposed project. <br /> 2) Describe waste material that will be discharged into the ground from septic tanks or <br /> other sources, if any(for example: Domestic sewage; industrial, containing the <br /> following chemicals. . .;agricultural;etc.). Describe the general size of the system,the <br /> number of such systems,the number of houses to be served(if applicable),or the number of <br /> animals or humans the system(s)are expected to serve. <br /> This is not an applicable question because there will be no waste water discharged into the ground. <br /> c. Water runoff(including stormwater): <br /> 1) Describe the source of runoff(including storm water)and method of collection <br /> and disposal,if any(include quantities,if known). Where will this water flow? <br /> Will this water flow into other waters? If so,describe. <br /> The proposal does not anticipate runoff water(including stormwater)to interfere with the area of work. <br /> The project will operate under full containment.Storm water in the work area will be pumped to tanks <br /> for off site disposal as necessary. <br /> 2)Could waste materials enter ground or surface waters? If so,generally describe. <br /> This is not an applicable questions because there will be no waste water produced from the project. <br /> 3) Does the proposal alter or otherwise affect drainage patterns in the vicinity of the site? If so, <br /> describe. <br /> No. The proposal will not alter or affect existing drainage patterns in the vicinity of the site. <br /> d. Proposed measures to reduce or control surface,ground,and runoff water,and drainage pattern <br /> impacts,if any: <br /> The proposal does not anticipate surface, ground,or runoff water(including stormwater)to interfere <br /> with the area of work. <br /> 4. Plants <br /> SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 6 of 16 g) <br />
The URL can be used to link to this page
Your browser does not support the video tag.