Laserfiche WebLink
REQUEST FOR COMMENTS ON <br /> LAND USE APPLICATION <br /> Project#: REV117-009 <br /> Project Planner: Teresa Weldon <br /> To: Engineering/Public Services Reviewers <br /> From: Sabrina Fandler, Development Technician <br /> Date sent: 4/17/2017 <br /> Project#: REV117-009 <br /> Associated project#(s): PREAPP16-039 <br /> Proposal: Assisted Living, 16 bed 'Enhanced Services Facility' <br /> A Design Review and Unlisted Use Application have been submitted for a new 16 bed `Enhanced <br /> Services Facility' (similar to an assisted living facility use). The building also includes 3,000 SF of <br /> ground floor retail, 14 under-building parking stalls, 20 surface parking stalls and related site <br /> improvements. <br /> Location: 6502 EVERGREEN WAY <br /> Applicant: J T MADISON INC <br /> • Share Point Link to attachments if electronic submission: (copy&paste into your browser) <br /> https://ftp.everettwa.gov/?ShareToken=2ED4F3D1C522B1596F388E <br /> Return your comments to Sabrina Fandler by . <br /> (Even if your response is "No Comment") <br /> COMMENTS: (Please write directly on this form) <br /> The paratransit loading area and building access will be from Fleming Street with ramp to building meeting ADA <br /> standards. V. Bruscas 4/3/17 <br /> Distribution List (Route all plans/materials): <br /> ❑Development Technician - Sabrina Fandler <br /> Sewer& Drainage: <br /> ❑Brian Doolan(always gets plans) <br /> ['Arnie Roshak (always gets plans, Drainage Report when Combined System) <br /> ❑Jane Zimmerman(gets plans & Drainage Report when separated System) <br /> ['Erik Emerson(gets plans &Drainage Report when Waterfront Place Central) <br /> ❑Traffic—Michael Brick <br /> Water—Richard Hefti <br /> Water—Jim Spooner(share with Tim Markham) <br /> ❑Real Property—Mike Palacios <br /> ❑Building Official—Tony Lee <br /> ❑Permit Services Manager—Paul McKee <br /> ®Transit and Transportation—Vincent Bruscas <br /> ❑Industrial Pretreatment—Jeff Kerwin <br /> CC List (Route Distribution Sheet Only): <br /> ❑Streets—Roy Harris <br /> ❑Utilities—Mark Sadler <br /> [Public Works Director—Dave Davis (include copy of site plan when available) <br /> Revised 3/29/2016 <br />