Laserfiche WebLink
f <br /> INFORMATION FOR THE DEVELOPER: <br /> PUBLIC WORKS—Benyam Stephanos— bstephanos@everettwa.gov/425.257.7289 <br /> 1. Construction permits, inspections and final approvals are required for this project from City of <br /> Everett Permit Services. <br /> 2. A Public Works Permit is required for this project. All improvements shall be completed, approved, <br /> and warranted before the Occupancy Permit is issued/final approval is granted. <br /> 3. Stormwater shall be managed in accordance with City of Everett Stormwater Management <br /> Standards current at the time the public works/building permit application package is submitted to <br /> the City for review. <br /> 4. Special charges for connection to the sewer and water systems in accordance with Ordinance 3095- <br /> 08 (codified as EMC 14.08.135) and subsequent revision are applicable. These charges are based on <br /> projected water usage and can be substantial. Applicant is encouraged to obtain a copy of the <br /> Ordinance and determine estimated charges prior to building permit application. The actual charges <br /> shall be computed by the Public Works Department per the ordinance in effect at the time and <br /> according to the information on the approved plans at the time of building permit issuance. <br /> 5. This project is subject to Transportation Mitigation in accordance with Ordinance 3389-14(codified <br /> as EMC 18.40) and subsequent revision. Applicant is encouraged to obtain a copy of the Ordinance <br /> and determine applicable mitigation fees and/or other requirements prior to building permit <br /> application. The actual charges and requirements shall be as per the information on the approved <br /> plans and an approved Traffic Study at the time of building permit issuance and the ordinance in <br /> effect at that time.You may contact the Traffic Engineering Department for an estimate only of <br /> Mitigation Fees (Michael Brick:425-257-7790, MBrick@everettwa.gov). <br /> 6. If the NCU change is approved, IPT's primary concern would be that there are no drains direct to <br /> sewer in shop areas. If there any drains in shop/maintenance areas, such drains should be routed to <br /> an oil water separator before connection to sanitary sewer. A dumpster area for the site could <br /> present concerns depending on what is storage/kept. I believe SWM requires these pads/enclosures <br /> to be covered now in the separate sewer area. If there are any drains in a trash pad area, it should <br /> also route to sewer via an oil water separator. If other details warrant additional concerns or <br /> requirements we can address those as needed. <br /> PLANNING DIVISION—Kelsey Heyd—kheyd@everettwa.gov/425.257.7275 <br /> 7. Signage: Sign Category A applies to the site.See EMC 19.36 for general sign regulations and EMC <br /> 19.316.090 for E-1MUO specific design standards. A sign permit meeting the sign permit checklist is <br /> required for any new sign(s) on the building. Removal of nonconforming signs shall be required in <br /> accordance with EMC 19.36.200. <br /> FIRE DEPARTMENT—Steve Goforth—sgoforth@everettwa.gov/425.257.8104 <br /> 8. The fire alarm system does not show as up to date.The system needs to address the use of the <br /> building and need a current test on the system. <br /> 4riEn- Page 3 of 3 <br /> REVII18-023 <br />