My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2924 100TH ST SE 2025-06-24
>
Address Records
>
100TH ST SE
>
2924
>
2924 100TH ST SE 2025-06-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2025 7:49:39 AM
Creation date
4/15/2025 11:38:55 AM
Metadata
Fields
Template:
Address Document
Street Name
100TH ST SE
Street Number
2924
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT Date Applied: 12/6/2021 <br /> City of Everett Permit Services Public Works Permit#: PW2112-009 <br /> 3200 Cedar Street, 211 Floor Associated Bldg Permit#: <br /> EVERETT <br /> Everett, WA 98201 Planning Reference#: <br /> WASHINGTON 425-257-8810 Public Works Fee: $65.00 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> WEBSTER NICOLE&CHELEMEDOS DAVID WAYNE NICOLE CHELEMEDOS <br /> 3002 100TH ST SE 3002 100TH ST SE <br /> EVERETT,WA,98208-4343 EVERETT,WA,98208 <br /> PHONE: PHONE:4252991126 <br /> TAX PARCEL ID#:28052000101600 SITE ADDRESS:2924 100TH ST SE <br /> DESCRIPTION: PLANTING IN RESTORATION AREA <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett`Design and Construction Standards and Specifications <br /> for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig.The day you call does not count.TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans,SWPPP,and drainage report approved by the City of Everett Public Works Department dated <br /> 12/06/2021.Approved plans must remain on job-site at all times. <br /> 5. Inspections are required for all stages of construction.Visit the City's Online Permitting Portal at pw.everettwa.gov to formally request all <br /> required inspections.A handout is provided at permit issuance with instructions on how to request an inspection online. <br /> 6. Any damage to City improvements(sidewalk,curb, roadway,etc.)shall be replaced per City Standards and/or as directed by the City PW <br /> Inspector. <br /> 7.A Landscape Inspection is required by the Planning Department prior to final by the Public Works Inspector.To schedule a planning <br /> inspection,contact Planning@everettwa.gov and request an inspection with the permit number,site address,and inspection type listed. <br /> Please allow up to one week for the inspection to be scheduled. <br /> 8. Prior to any interruption to the public right-of-way(roadways,parking lanes,or sidewalks)a Traffic Street Use permit shall be obtained <br /> from the City's Traffic Engineering Division.This permit can be applied for online at pw.everettwa.gov and requires a traffic control plan to be <br /> submitted for the area of requested closure. Please allow 1-2 weeks for TSU permit issuance from the date of application. <br /> 9.This permit must be finaled in order to close out this permit/grant. Request a final inspection online by selecting PW 25-Site Final/Permit <br /> Close Out within the Online Permitting Portal Inspection Requests when all items have been completed for this permit. <br /> Public Works Permit Fee Breakdown: <br /> Misc. Permit Fee(planting restoration)...........$25.00 <br /> PW Plan Review...............................................$20.00 <br /> PW Site Inspection...........................................$20.00 <br /> City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> By purchasing this permit and commencing work,the owner/applicant <br /> hereby agrees to hold and save harmless the City of Everett from any <br /> and all claims for damages,costs,expenses,or causes of action that <br /> ��,O"� may arise because of installation and maintenance of the <br /> 12/06/2021 improvement or other right-of-way use here to applied for and further <br /> agrees to remove same upon notice from the City and to replace <br /> Approved for Construction, Public Works Dept. Date public property damaged thereby. <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO COMPLETION.THIS PERMIT MAYBE CANCELLED BY THE <br /> CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 180-DAY DURATION.EACH INSPECTION EXTENDS THE EXPIRATION DATE 180 DAYS TO KEEP THE PERMIT OPEN WHILE WORK IS ACTIVE. <br /> APPLICANT/JOB SITE COPY TREASURER ADDRESS FILE <br />
The URL can be used to link to this page
Your browser does not support the video tag.