Laserfiche WebLink
1EQUEST FOR COMME S ON <br /> LAND USE APPLICA ON <br /> -1 J Project#: SEPA17-007 <br /> �' Project Planner:JOHN JIMERSON <br /> To: Engineering/Public Services Reviewers <br /> From: SABRINA FANDLER, Development Technician <br /> Date sent: 5/8/2017 <br /> Project#: SEPA17-007 <br /> Associated project#(s): <br /> Proposal: 123,000 s.f. Fed Ex Building <br /> Location: 7301 Hardeson <br /> Applicant: David Gartland <br /> • Share Point Link to attachments if electronic submission: (copy&paste into your browser) <br /> Return your comments to SABRINA FANDLER by 5/19/2017. <br /> (Even if your response is "No Comment") <br /> COMMENTS: (Please write directly on this form)Name & Date: jakiihi, —4c �1&Ir4 (/fg. <br /> Distribution List(Route all plans/materials): <br /> siElDevelopment Technician - SABRINA FANDLER <br /> Sewer& Drainage: <br /> Brian Doolan (always gets plans)nos&one P <br /> 4-41 irk <br /> /1Arnie Roshak(always gets plans, Drainage Report when Combined System)NC. <br /> /1Jane Zimmerman (gets plans& Drainage Report when separated System)Set cornmr4 <br /> ❑Erik Emerson (gets plans& Drainage Report when Waterfront Place Central) <br /> xrETraffic—Michael Brick <br /> x®Water—Richard Hefti <br /> Water—Jim Spooner(share with Tim Markham) A coYr nt& d ^j�om bed <br /> Real Property—Mike Palacios <br /> Building Official—Tony Lee <br /> Permit Services Manager—Paul McKee <br /> X®Transit and Transportation—Vincent Bruscas <br /> J®Industrial Pretreatment—Jeff Kerwin —rs-S€E_ eornOW th <br /> CC List(Route Distribution Sheet Only): <br /> ®Streets—Roy Harris <br /> Utilities—Mark Sadler <br /> ®Public Works Director—Dave Davis(include copy of site plan when available) <br /> Revised 4/5/2017 DIST1705-006 <br />