My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7301 HARDESON RD SEPA 017 - 007 AND DIST 1705 - 006 - FED EX BUILDING Land Use Decision Documents 2025-04-21
>
Address Records
>
HARDESON RD
>
7301
>
SEPA 017 - 007 AND DIST 1705 - 006 - FED EX BUILDING
>
Land Use Decision Documents
>
7301 HARDESON RD SEPA 017 - 007 AND DIST 1705 - 006 - FED EX BUILDING Land Use Decision Documents 2025-04-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2025 3:19:35 PM
Creation date
4/15/2025 11:45:02 AM
Metadata
Fields
Template:
Address Document
Street Name
HARDESON RD
Street Number
7301
Tenant Name
SEPA 017 - 007 AND DIST 1705 - 006 - FED EX BUILDING
Address Document Type
Land Use Decision Documents
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SW Everett Subarea — General Project Information Form <br /> Complete the tables below if the project location is in the Southwest Everett Subarea. The <br /> following information will be used by the City: <br /> • for monitoring of impacts in the SW Everett Subarea; and <br /> • to determine if the proposal falls within the impact thresholds identified in the Mitigation <br /> Decision Document. <br /> SW Everett Subarea - General Information Categories Project Proposal <br /> Is the site covered by a concomitant agreement or master plan? ❑ Yes 0 No <br /> If yes, attach a copy. <br /> Has the City approved previous projects on the site? 0 Yes El No <br /> If so, list the project review numbers <br /> Is there existing development on the site? 0 Yes O No <br /> If so, list existing building square footage sq ft. <br /> What is the proposed use? Industrial <br /> What is the Vehicle Trips/Peak Hour Per Net Developable Acre? <br /> Additional analysis required if proposal exceeds 30 peak hour trips per acre. TBD <br /> What is the water usage? Additional analysis required for development Peak hour demand: <br /> proposals with a peak hour demand above 2.7 gpm/acre (approximately TBD <br /> 4,000 gpa/day peak flow) and/or a fire flow requirement of 3,500 gpm or <br /> Fire flow: <br /> greater in area served by Everett. 4,000 gpm fire flow in area served by TBD <br /> Mukilteo Water District. <br /> What is the Sewer Discharge? Additional analysis required for projects TBD TBD <br /> with demand of more than 1,700 gallons per gross acre per day, and 4,000 <br /> gallons per gross acre per day of instantaneous peak flow. <br /> Total lot area in acres? 10.47 acres <br /> Net developable area in acres? (lot area minus critical areas and buffers) 10.47 acres <br /> Existing and proposed number of employees by type of employment Existing Proposed <br /> government 0 0 <br /> manufacturing Q 0 <br /> education Q 0 <br /> retail Q 0 <br /> finance, real estate and services (FIRE) 0 Q <br /> warehousing, communications,transportation, utilities (WCTU) 0 155 <br /> Total 155 <br /> 2930 Wetmore Ave,Suite 8-A Everett,WA 98201 0 425.257.8731 F 425.257.8742 0 www.everettwa.gov ® Updated 2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.