Laserfiche WebLink
SEPA ENVIRONMENTAL CHECKLIST FOR <br /> Project Name AGENCY <br /> • CEMEX- Mountain View Business Centre Div 9 USE <br /> fish: bass, salmon, trout, herring, shellfish <br /> b. List any threatened or endangered species known to be on or near the site. <br /> No threatened or endangered animal species are known to exist on or in <br /> the vicinity of the site. <br /> c. Is the site part of a migration route? If so, explain. <br /> The area is part of the Puget Sound Flyway. <br /> d. Proposed measures to preserve or enhance wildlife, if any: <br /> None. <br /> 6. Energy and Natural Resources <br /> a. What kinds of energy (electric, natural gas, oil, wood stove, solar)will be used to <br /> meet the completed project's energy needs? Describe whether it will be used <br /> for heating, manufacturing, etc. <br /> Future development will require electricity and natural gas for lighting <br /> and heating. <br /> b. Would your project affect the potential use of solar energy by adjacent <br /> properties? If so, generally describe. <br /> No <br /> c. What kinds of energy conservation features are included in the plans of this <br /> proposal? List other proposed measures to reduce or control energy impacts, if <br /> any: <br /> N/A for the BSP. Future development will comply with applicable <br /> energy codes. <br /> 7. Environmental Health <br /> a. Are there any environmental health hazards, including exposure to toxic <br /> chemicals, risk of fire and explosion, spill, or hazardous waste that could occur <br /> as a result of this proposal? If so, describe. <br /> No. <br /> 1) Describe special emergency services that might be required. <br /> None. <br /> 2) Proposed measures to reduce or control environmental health hazards, if any: <br /> None. <br /> Page 7 o€'f2 U7/4 <br />