My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7301 HARDESON RD SEPA 016 - 038 AND BSP 016 - 013 - CEMEX Land Use Decision Documents 2025-04-21
>
Address Records
>
HARDESON RD
>
7301
>
SEPA 016 - 038 AND BSP 016 - 013 - CEMEX
>
Land Use Decision Documents
>
7301 HARDESON RD SEPA 016 - 038 AND BSP 016 - 013 - CEMEX Land Use Decision Documents 2025-04-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2025 3:22:13 PM
Creation date
4/15/2025 11:56:46 AM
Metadata
Fields
Template:
Address Document
Street Name
HARDESON RD
Street Number
7301
Tenant Name
SEPA 016 - 038 AND BSP 016 - 013 - CEMEX
Address Document Type
Land Use Decision Documents
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
rile efoi°y <br /> PUBLIC WORKS <br /> MEMORANDUM <br /> TO: John Jimerson, Planning Department <br /> FROM: Sabrina Fandler, Engineering/Public Services Department <br /> DATE: 11-29-2016 <br /> SUBJECT: Public Works Comments for SEPA16-038/BSP16-003 <br /> PROPOSAL: Cemex 4-lot Binding Site Plan <br /> LOCATION: 7215 Hardeson Rd(assigned address for Project by Public Works) <br /> A review of this project by the Engineering/Public Works Department indicates that the following <br /> conditions shall be met: <br /> 1. Construction permits, inspections and final approvals are required for this project from City of <br /> Everett Permit Services. <br /> 2. A Public Works Permit is required for this project. Detailed drawings in accordance with City <br /> Design and Construction Standards shall be submitted to the Public Works Department, <br /> showing site parking layout, landscaping, utilities, storm drainage, temporary construction <br /> erosion control, and all required improvements in the public right-of-way. Public Works <br /> Department approval of these drawings is required prior to any permits being issued. All <br /> improvements shall be completed and approved before the Occupancy Permit is issued/final <br /> approval is granted. <br /> 3. The construction plans must be designed from a site survey performed by a licensed State of <br /> Washington land surveyor. <br /> 4. Temporary erosion control measures for construction activity must be operational prior to <br /> commencement of any clearing or earthwork. <br /> 5. Any grading/fill on this site shall be done so as to not impact the surrounding properties. <br /> 6. On-site water main will be staked within an easement to the City. The easement shall be 10' on <br /> one side of the water main and 5' on the other side of the water main. The easement <br /> documentation with legal description and exhibit shall be submitted to the City prior to issuance <br /> of permits. <br /> 7. A DCDA is required at every fire connection into the building. An RPBA is required on the <br /> domestic service and can be located in the Riser Room with a drain if within 70' of the <br /> connection to the main. A DCVA is required on the premise for irrigation. <br /> 8. Stormwater shall be managed in accordance with City of Everett Stormwater Management <br /> Standards current at the time a complete building/public works permit application package is <br /> submitted to the City for review. Contact the City's Stormwater reviewer with questions while <br /> preparing plans for permit review(Jane Zimmerman: JZimmerman@everettwa.gov). <br /> Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.