Laserfiche WebLink
b. Has the project site been used as working farmlands or working forest lands?If so,describe.How <br /> much agricultural or forest land of long-term commercial significance will be converted to other uses <br /> as a result of the proposal,if any?If resource lands have not been designated, how many acres in <br /> farmland or forest land tax status will be converted to nonfarm or nonforest use? <br /> Project site has not been used as a working farmland or working forest lands. <br /> 1)Will the proposal affect or be affected by surrounding working farm or forest land normal business <br /> operations,such as oversize equipment access,the application of pesticides,tilling,and harvesting?If <br /> so, how: <br /> The project will not be affected by surrounding working farm or forest lands normal business <br /> operations. <br /> c. Describe any structures on the site. <br /> Site consists of a 98,000 SF burned down industrial structure. <br /> d. Will any structures be demolished? If so,what? <br /> Complete demolition and removal of 98,000 SF burned down industrial structure. <br /> e. What is the current zoning classification of the site? <br /> Heavy£-ommereia+-; 2 <br /> manufricl(11)( <br /> f. What is the current comprehensive plan designation of the site? <br /> Heavy Industrial <br /> g. If applicable,what is the current shoreline master program designation of the site? <br /> IZ <br /> 1 <br />