My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
101 E MARINE VIEW DR SEPA 017 - 022 Land Use Decision Documents 2025-04-22
>
Address Records
>
E MARINE VIEW DR
>
101
>
SEPA 017 - 022
>
Land Use Decision Documents
>
101 E MARINE VIEW DR SEPA 017 - 022 Land Use Decision Documents 2025-04-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2025 11:51:47 AM
Creation date
4/15/2025 2:09:46 PM
Metadata
Fields
Template:
Address Document
Street Name
E MARINE VIEW DR
Street Number
101
Tenant Name
SEPA 017 - 022
Address Document Type
Land Use Decision Documents
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. ENVIRONMENTAL ELEMENTS <br /> 1. Earth <br /> a. General description of the site: <br /> (circle one): Flat, rolling, hilly,steep slopes,mountainous,other <br /> b. What is the steepest slope on the site (approximate percent slope)? <br /> Steepest slope would be 5% <br /> c. What general types of soils are found on the site(for example,clay,sand,gravel, peat, muck)? If <br /> you know the classification of agricultural soils,specify them and note any agricultural land of long- <br /> term commercial significance and whether the proposal results in removing any of these soils. <br /> Soil types are as follows,sand and gravel. <br /> ii <br /> d. Are there surface indications or history of unstable soils in the immediate vicinity? If so, <br /> describe. <br /> There are no surface indications or history of unstable soils in the immediate vicinity. <br /> _ I' <br /> e. Describe the purpose,type,total area,and approximate quantities and total affected area of any <br /> filling,excavation, and grading proposed. Indicate source of fill. <br /> Complete demolition and removal of 98,000 SF burned down industrial structure. It was deemed safer <br /> to remove structure then let debris sit in current state. <br /> f. Could erosion occur as a result of clearing,construction,or use? If so,generally describe. <br />
The URL can be used to link to this page
Your browser does not support the video tag.