My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
101 E MARINE VIEW DR SEPA 018 - 011 Geotech Report 2025-04-15
>
Address Records
>
E MARINE VIEW DR
>
101
>
SEPA 018 - 011
>
Geotech Report
>
101 E MARINE VIEW DR SEPA 018 - 011 Geotech Report 2025-04-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 2:55:44 PM
Creation date
4/15/2025 2:55:10 PM
Metadata
Fields
Template:
Address Document
Street Name
E MARINE VIEW DR
Street Number
101
Tenant Name
SEPA 018 - 011
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geotechnical Engineering Evaluation NGA File No.988017 <br /> East Marine View Drive Warehouse May 19,2017 <br /> Everett,Washington Page 9 <br /> two percent of optimum so that a readily compactable condition exists. It may be necessary to over- <br /> excavate and remove wet soils in cases where drying to a compactable condition is not feasible. All <br /> compaction should be accomplished by equipment of a type and size sufficient to attain the desired degree <br /> of compaction. <br /> Slab-on-Grade <br /> Due to the very loose/soft nature of the soils that underlie the site,we recommend the slab be designed as <br /> a structural element and supported directly on the compacted rock aggregate piers. The aggregate piers <br /> within the slab should be spaced no more than eight feet on center. The slab should be additionally <br /> reinforced to limit potential impacts from settlement and should be doweled into the building foundation <br /> near door openings to limit differential settlement in these areas. <br /> We recommend that all floor slabs be underlain by at least six inches of free-draining sand or gravel for <br /> use as a capillary break. We recommend that the capillary break be hydraulically connected to the footing <br /> drain system to allow free drainage from under the slab. A suitable vapor barrier, such as heavy plastic <br /> sheeting(6-mil minimum), should be placed over the capillary break material. <br /> Pavements <br /> Pavement subgrade preparation, and structural fill placement where required, should be completed as <br /> recommended in the Site Preparation and Grading and Structural Fill subsections of this report. We <br /> recommend that the proposed pavement areas be overexcavated by a minimum of 18-inches and the entire <br /> resulting subgrade should be covered with a non-woven filter fabric overlain by a Tensar TX160 geogrid. <br /> The geogrid should then be covered with the overexcavated material if it meets structural fill <br /> specifications and should be compacted to structural fill specifications. A minimum 8-inch thick base <br /> course layer should be placed over the prepared subgrade and the pavement placed on the crushed rock. <br /> The pavement subgrade should be heavily compacted and proof-rolled with a heavy, rubber-tired piece of <br /> equipment, to identify soft or yielding areas that require repair prior to placing structural fill and prior to <br /> placing the pavement base course. We should be retained to observe the proof-rolling and recommend <br /> subgrade repairs prior to placement of the asphalt or hard surfaces. <br /> Underground Utilities <br /> Heavy groundwater seepage may be encountered within the utility trench excavations, depending on final <br /> depths. If groundwater is encountered in the utility excavations,we recommend that adequate dewatering <br /> measures be implemented to allow installation of the utilities. At a minimum, pump and sump systems <br /> should be utilized to keep water out of the excavations, but more elaborate dewatering may be needed <br /> depending on final depths. Adequate shoring, such as the use of trench boxes, should also be utilized to <br /> NELSON GEOTECHNICAL ASSOCIATES, INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.