My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HDR Engineering, Inc. 4/8/2025 Amendment 1
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
HDR Engineering, Inc. 4/8/2025 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2025 12:44:48 PM
Creation date
4/16/2025 12:44:33 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
HDR Engineering, Inc.
Approval Date
4/8/2025
Council Approval Date
2/12/2025
End Date
12/31/2027
Department
Public Works
Department Project Manager
Jeff Marrs
Subject / Project Title
Puget Sound Nutrient General Permit, NPDES Permit and Water Quality Support
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0003623
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
HDR Engineering, Inc. 1/20/2023
(Amendment)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
1 <br /> AMENDMENT NO. 1 PROFESSIONAL SERVICES AGREEMENT <br />This Amendment to Professional Services Agreement (“Amendment”) is effective as of <br />the date of the Mayor’s signature below, and is between the City of Everett, a Washington <br />municipal corporation (the “City”), and the person identified as the Service Provider below <br />(“Service Provider”). The City and Service Provider are parties to the Professional Services <br />Agreement described below, as may have been previously amended ("Agreement"). In <br />consideration of the covenants, terms and conditions set forth below, and for good and valuable <br />consideration, the receipt and sufficiency of which are hereby acknowledged, the City and Service <br />Provider agree to amend the Agreement as set forth below: <br />Service Provider HDR Engineering, Inc. <br />City Project Manager <br />Jeff Marrs <br />jmarrs@everettwa.gov <br />Original <br />Agreement Date <br /> <br />1/20/2023 <br /> <br />AMENDMENTS <br />New Completion Date <br />If this Amendment changes the Completion Date, enter the new Completion Date: Enter new Completion Date, if any If no new date is entered, this Amendment does not change the Completion Date. <br />New Maximum Compensation Amount <br />If this Amendment changes compensation, complete the following table. If the table is not completed, this Amendment does not change compensation. <br />Maximum Compensation Amount Prior to this Amendment Enter amount, if applicable <br />Compensation Added (or Subtracted) by this Amendment Enter amount, if applicable <br />Maximum Compensation Amount After this Amendment Enter amount, if applicable <br />
The URL can be used to link to this page
Your browser does not support the video tag.