My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HDR Engineering, Inc. 4/8/2025 Amendment 1
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
HDR Engineering, Inc. 4/8/2025 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2025 12:44:48 PM
Creation date
4/16/2025 12:44:33 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
HDR Engineering, Inc.
Approval Date
4/8/2025
Council Approval Date
2/12/2025
End Date
12/31/2027
Department
Public Works
Department Project Manager
Jeff Marrs
Subject / Project Title
Puget Sound Nutrient General Permit, NPDES Permit and Water Quality Support
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0003623
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
HDR Engineering, Inc. 1/20/2023
(Amendment)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
EXHIBIT A <br />ADDITION TO SCOPE OF WORK <br /> <br />Task 5.2 – PBDE Reduction Program and New NPDES permit support <br /> <br />(NEW TASK UNDER EXISTING TASK 5.0 ON-CALL BUDGET ALLOWANCE) <br /> <br />The City was issued a new NPDES permit on November 21, 2024 with effective date of January 1, 2025. <br />The permit requires substantial new activities and submittals under a newly-established PBDE Reduction <br />Program. Additionally, new monitoring is required for PFAS and other compounds. HDR will support the <br />City in NPDES permit compliance activities and deliverables as directed by the City. Establishing this task <br />under the existing on-call budget allows a means to track expenses for related support services. <br />Specific deliverables and known support needs include the following: <br /> <br />• PBDE Quality Assurance Project Plan (QAPP) – This submittal is required to memorialize the <br />PBDE sampling plan and quality assurance/quality control protocols. HDR will assist in preparing <br />the QAPP based on experience from other Ecology-approved QAPPs and standing City protocols <br />for PBDE sampling. <br /> <br />• PBDE BMP identification and implementation – PBDE reduction best management practice <br />(BMP) identification and implementation is required and to be documented as part of the City’s <br />annual pretreatment report. HDR will assist the City with evaluating industrial user sampling data, <br />BMP identification, and implementation strategies. <br /> <br />• Seasonal Flow Management – The NPDES permit requires the City to formalize operational <br />protocols aimed at minimizing discharge to Outfall 015 during the March – June Chinook salmon <br />migration window. HDR will assist the City with developing, evaluating, and documenting such <br />strategies. <br /> <br />• Technical Assessment of Lagoon process PBDE management – The NPDES permit requires the <br />City to evaluate lagoon process management to identify viable strategies to minimize BPDE <br />discharge from Outfall 015. HDR will assist the City with developing, evaluating, and <br />documenting such strategies to the extent that viable strategies exist. <br /> <br />• Overall PBDE reduction program evaluation and modification – The NPDES permit requires <br />evaluation of PBDE reduction program efficacy and opportunities for adaptive management. <br />HDR will assist the City with ongoing overall PBDE reduction program evaluation, adaptive <br />management, documentation, coordination with Ecology, and related needs as directed by the <br />City. <br />
The URL can be used to link to this page
Your browser does not support the video tag.