Laserfiche WebLink
<br /> <br />________________________________________________________________________________________________________ Page 17 of 17 <br /> <br />Attachment C: Reporting Requirements <br /> <br />No later than May 31, 2025, the city must submit the following to AWC: <br /> <br />Audits of Tier 1 buildings: <br />• Invoice demonstrating payment for the audit <br />• A completed building improvement plan for each building included in the audit, including: <br />o Compliance pathway, if applicable <br />o Performance metric for each building <br />o Estimated cost of meeting the Energy Performance Metric <br />o Estimated cost of developing and implementing an energy management plan, as required by the CBPS <br />o Estimated cost of developing and implementing an operations and maintenance program, as required <br />by the CBPS <br />• A completed Form D Audit Report <br /> <br />Audits of Tier 2 buildings: <br />• Invoice demonstrating payment for the audit <br />• A completed building improvement plan for each building included in the audit, including: <br />o The identified Energy Efficiency Measures (EEMs) <br />o Range of estimated costs to implement the EEMs <br />o Estimated cost of developing and implementing an energy management plan, as required by the CBPS <br />o Estimated cost of developing and implementing an operations and maintenance program, as required <br />by the CBPS <br /> <br />All work must be completed, and reports and reimbursement requests submitted , no later than May 31, 2025. <br /> <br />Docusign Envelope ID: E11F3824-B57B-4827-BEDB-7B35A1462326