Laserfiche WebLink
installed to establish a native riparian community. Outside of the riparian buffer,exposed bare soils will <br /> be restored with landscaping and/or grass hydroseed. <br /> e. List all noxious weeds and invasive species known to be on or near the site. f helpl <br /> Himalayan blackberry and reed canaiygrass was identified along the roadway within the project area.No <br /> other noxious or invasive plant species is known to be on or near the site. <br /> 5. Animals Jhelpl <br /> a. List any birds and other animals which have been observed on or near the site or are known <br /> to be on or near the site. Jhelpl <br /> Examples include: <br /> birds. haw •-ror -a.le on+birds ether: <br /> mammas: deer ' 'ek, beaver, other: <br /> fish: bass, s.lmo rout erring, shellfish, other <br /> b. List any threatened and endangered species known to be on or near the site. [help] <br /> There are no known threatened or endangered animal species located near the site. <br /> c. Is the site part of a migration route? If so, explain. Jhelpl <br /> The state of Washington is located in the Pacific flyway zone,a major waterfowl route. No other <br /> migration routes are known.The stream is not considered a migration route because there is a fish passage <br /> barrier(falls)downstream from the project site. <br /> d. Proposed measures to preserve or enhance wildlife, if any: Jhelpl <br /> The project consists of installing a fish passable culvert at this crossing and create a more natural stream <br /> channel within the project footprint. No other measures are proposed. <br /> e. List any invasive animal species known to be on or near the site. Lelpj <br /> There are no invasive animal species known to be on or near the project site. <br /> 6. Energy and Natural Resources Jhelpl <br /> a. What kinds of energy(electric, natural gas, oil, wood stove, solar)will be used to meet <br /> the completed project's energy needs? Describe whether it will be used for heating, <br /> manufacturing, etc. Jhelpl <br /> The completed project will not need energy. <br /> b. Would your project affect the potential use of solar energy by adjacent properties? <br /> If so, generally describe. Lhelpl <br /> SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 9 of 18 <br />