My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10531 29TH AVE SE 2025-06-24
>
Address Records
>
29TH AVE SE
>
10531
>
10531 29TH AVE SE 2025-06-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2025 9:16:17 AM
Creation date
4/17/2025 11:03:40 AM
Metadata
Fields
Template:
Address Document
Street Name
29TH AVE SE
Street Number
10531
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f� <br /> CITY OF EVERETT <br /> OFFICE USE ONLY <br /> EVERETT Permit Services Transmittal Date Received Stamp <br /> WASHINGTON <br /> PERM IT/PROJ ECT#: PV2411-001 <br /> SITE ADDRESS: 10531 29th Ave SE, Everett, Washington, 98208 <br /> PROJECT NAME: Casey Kopp PV <br /> FROM: Amber Thompson COMPANY: EIRS Field Ops, LLC ❑Chronology—Permit Counter Transmittal <br /> ❑Plan Review Routing <br /> PHONE#: 385-482-0045 EMAIL: <br /> Location: ❑File []Reviewer Office <br /> permitting.department@blueravensolar.com Date Logged: By: <br /> Route to: (Check all that apply) Name of Reviewer Type of Review <br /> O Planning Reviewer Name: N/A Q Re-Review <br /> ❑ Public Works Reviewer Name: ❑ Revisions After Approval <br /> ❑ Building Reviewer Name: ❑ Revisions After Issuance <br /> ❑ Fire Reviewer Name: ❑ Other <br /> ❑ Other Reviewer Name: ❑ Other <br /> Provide quantities for all items submitted <br /> PLANS REPORTS/CALCULATIONS OTHER DOCUMENTS <br /> Qty Qty Qty <br /> Architectural/Building Plans Geotechnical Report 1 Correction Letter Responses <br /> Structural Plans _ Drainage Report _ Draft Easement <br /> Civil Plans _ SWPPP Report _ Recorded Easement <br /> Site Plan Wetland Report Height Survey <br /> Landscape Plan _ Critical Area Report _ Base Elevation Survey <br /> Survey _ Traffic Study/TDM Report _ Critical Area Covenant <br /> Elevations Structural Calculations Stormwater Covenant <br /> Floor Plans _ Height Calculations _ Covenant-Other <br /> Special Inspection Report Plumbing Calculations _ Performance Guarantee <br /> As-Builts Other _ Warranty Bond <br /> Plat Maps _ Other _ Other <br /> Original City Redlines Returned _ Other _ Other <br /> Other _ Other _ Other <br /> Other Other Other <br /> Items submitted are: <br /> O Complete Plan Set Replacement 7 Additional Documents <br /> (Slip-sheeting not permitted) (To be added to file) <br /> Comments to Reviewer: FOR CHANGES IN SCOPE: <br /> Revised Description of Work: <br /> Uploaded the Photovoltaic Checklist <br /> Revised Valuation: N/A <br /> Signed: 4 , An Date: 11 / 19/2024 <br /> Permitting Coordinator <br />
The URL can be used to link to this page
Your browser does not support the video tag.