My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3000 41ST ST 2025-06-25
>
Address Records
>
41ST ST
>
3000
>
3000 41ST ST 2025-06-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2025 10:41:00 AM
Creation date
4/17/2025 11:27:41 AM
Metadata
Fields
Template:
Address Document
Street Name
41ST ST
Street Number
3000
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DESIGNu- <br />Project Name: Everett River Front- Simpson <br />GeoDesign # : Polygon-127-02 <br />Reports with Unresolved Nonconformance Issues: <br />Low sewer trench compaction: DFR 97, 101, 102, 103, 104, 105, 106, 107, 108, 111, 112, 113 <br />125 <br />Low storm drain trench compaction: DFR 115, 116, 117, 118, 119, 120, 121, 122, 123 <br />Ron Bowen (Polygon) <br />Stephen Farnan (Polygon) <br />Distribution: <br />Kyler Meek (Polygon) <br />Randy Allen (City of Everett) <br />Attachments: ❑ Site Plan(s) <br />❑ Installation Records <br />❑ Density Test Summary <br />❑ Other <br />FIELD REPORT <br />1 of 4 <br />Report: 126 <br />Date: 1 /3/2019 <br />Permit: <br />PW1505-005 <br />Weather: Overcast, 30's <br />Arrival/Departure: 1130/1200 <br />Prepared By: Aubrey Hodgins <br />Signature: 0 <br />Reviewed Bv: <br />PURPOSE of VISIT: GeoDesign representative, Aubrey Hodgins, was on -site part time at the request of Stephen Farnan <br />with Polygon Homes to observe installation of sanitary sewer main for Phase 3. <br />SITE VISIT: <br />Upon arrival at the site, GeoDesign was informed that the WSB crew had been sent to another job site and that there would <br />be no sewer main installed today. <br />Before leaving the site, GeoDesign confirmed with WSB that they would be back tomorrow to begin installation of the <br />sanitary sewer main on Road B. <br />This report presents opinions formed as a result of our observation of activities relating to geotechnical engineering or environmental services. We rely on the contractor to comply with the plans and <br />specifications throughout the duration of the project irrespective of the presence of our representative. Our work does not include supervision or direction of the contractor, the contractor's employees <br />or agents. Our firm is not responsible for site safety. This field report is a DRAFT representation of our field observations, testing, and preliminary recommendations. The report can only be considered <br />final upon review of the GeoDesign project manager, as indicated by initials in the "Reviewed By" section. <br />10700 Meridian Avenue North, Suite 402 1 Seattle, WA 98133 1 206.838.9900 <br />2502 Jefferson Avenue I Tacoma, WA 98402 1 253.203.0095 <br />
The URL can be used to link to this page
Your browser does not support the video tag.