My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
600 RIVERSIDE RD RIVERSIDE BUSINESS PARK 2025-06-25
>
Address Records
>
RIVERSIDE RD
>
600
>
RIVERSIDE BUSINESS PARK
>
600 RIVERSIDE RD RIVERSIDE BUSINESS PARK 2025-06-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2025 7:55:18 AM
Creation date
4/17/2025 12:04:10 PM
Metadata
Fields
Template:
Address Document
Street Name
RIVERSIDE RD
Street Number
600
Tenant Name
RIVERSIDE BUSINESS PARK
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: PW1804-024 Description:WO 3591-02 CONSTRUCT TRAILS AT RIVERSIDE BUSINESS <br /> PARK <br /> Applied:4/11/2018 Approved:8/27/2018 Site Address: 600 RIVERSIDE RD <br /> Issued:8/27/2018 Finaled: 7/28/2020 City,State Zip Code: EVERETT,WA 98201 <br /> Status: FINALED Applicant:GRONEWALD ELISE <br /> Parent Permit: Owner: EVERETT PORT OF <br /> Parent Project:SMA18-003 Contractor:<NONE> <br /> Details: <br /> Construction of 10-wide public access trails along Riverside Business Park.Segments included in these plans include Segments C, D,J, <br /> K,&F,and viewpoints G and H. Landscaping along the shoreline and upland area are included in this project. <br /> W.O.#3591-02 <br /> See also 600 Riverside Rd in Laserfiche. <br /> WO 3591-02 CONSTRUCT TRAILS AT RIVERSIDE BUSINESS PARK <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> 4/3/2019 4/3/2019 PW 01-JOB START RANDY ALLEN APPROVAL <br /> NOTIFICATION <br /> Notes: <br /> 4/18/2019 4/18/2019 PW 22-OTHER RANDY ALLEN CORRECTION see notes <br /> REQUIRED <br /> Notes: <br /> Phone:425-531-6190 <br /> (4/18/2019 2:12 PM RDA) <br /> All monitoring well points to be flush with ground and or pavement and graded such not to have any ponding on path. <br /> 10/17/2019 10/17/2019 PW 24-SITE FINAL RANDY ALLEN CORRECTION <br /> REQUIRED <br /> Notes: <br /> Need as built drawings for utilities <br /> 4/15/2020 4/15/2020 PERMIT EXTENSION KATHY COLLISON APPROVAL Due to COVID-19 <br /> Notes: <br /> 7/28/2020 7/28/2020 ADMIN USE ONLY** KATHY COLLISON APPROVAL <br /> Notes: <br /> 7/28/2020 7/28/2020 PWASBUILTS RANDY ALLEN APPRVD-PERMIT <br /> SUBMITTED FINAL <br /> Notes: <br /> I <br /> Printed:Thursday, 17 April,2025 1 of 1 <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.