Laserfiche WebLink
VERETT <br />0 <br />Permit Inspections <br />City of Everett <br />9/26/2022 <br />9/26/2022 <br />ELEC 05-SERVICE <br />MIKE BEARDA <br />PARTIAL <br />APPROVAL <br />Notes: <br />I'm doing turn off power in morning to finish the electrical and turn off afternoon but Pud needs LNI to check if before they turn it on. Monday works <br />Thank you <br />Paul Dovgalyuk <br />MCB changed Inspection Type from ELEC 10-FINAL to ELEC 05-SERVICE <br />Ok service only, branch circuits not finished separate grounds and neutrals in sub panels <br />10/7/2022 <br />10/7/2022 <br />ELEC 10-FINAL <br />STEVE BANKS <br />APPRVD-PERMIT <br />FINAL <br />Notes: <br />pauldovgalyuk@gmail.com <br />I <br />Printed: Thursday, 17 April, 2025 3 of 3 rk <br />SUPERION <br />