Laserfiche WebLink
Boeing Site Services <br /> Project Title: Replace Water Heater <br /> Boeing Project Number: W7492693 Discipline: Mechanical <br /> SUBMITTAL NO.: 2 <br /> To: (Boeing Construction Manager) Corrections and/or comments made to the submittal <br /> materials during this review do not relieve the Contractor <br /> from compliance with the requirements of the drawings <br /> and specifications. This review is intended to verify <br /> general conformance with the design concept of the <br /> Date Received: 3/10/2023 project and general compliance with the contract <br /> documents. The Contractor shall remain responsible for <br /> details and accuracy in confirming and correlating all <br /> Date Returned: 3/13/2023 quantities and dimensions; selecting fabrication processes <br /> and techniques of construction; coordinating work with all <br /> Subject: other trades; and performing the work in a safe and <br /> satisfactory manner. <br /> Upon review of the subject submittal documents, the following action(s) shall be taken: <br /> AR = Amend and Resubmit NR = Not Reviewed <br /> MCN = Make Corrections as Noted RR = Rejected, Resubmit <br /> NET = No Exceptions Taken <br /> Item Action Reference Manufacturer/Supplier Description Comment No. <br /> (Spec/Dwg) <br /> 1. NET 18-86906-22223 HUBBELL HEATERS NOTE 1 REFRENCES LIST 1 <br /> OF MATERIAL <br /> 2. NET 18-86906-22223 HUBBELL HEATERS SAFETY SOLENOID SYSTEM 2 <br /> 3. NET 18-86906-22223 HUBBELL HEATERS ELECTRONIC CONTROL 3 <br /> 4. <br /> 5. <br /> 6. <br /> 7. <br /> 8. <br /> 9. <br /> 10. <br /> Comments: <br /> 1. Please provide O&M manual for the unit. <br /> 2. Please ensure the unit is equipped with the option of safety solenoid shut-off valve to <br /> close the steam supply at Hi-Limit set point? <br /> 3. Please ensure the type of steam control is electronic. <br /> 4. <br /> 5. <br /> Distribution: By: FATAH DALLA <br /> (Reviewer's Name) <br /> (Title) <br /> (Tel. No.) <br />